Loading…
Loading…
Tender Value
₹6.2 L
EMD Value
₹12,400
Closing Date
7 Jul 2026, 4:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Neeraj Kumar Singh
Lower Division Agra Canal Agra
RE-CONSTRUCTION OF V.R.B. OF F.S BRANCH AT Km. 80.660 IN DISTT. AGRA
2026_UPIDC_1164851_7
02/EE/2026-27
Open Tender
Civil Works
90 days
RE-CONSTRUCTION OF V.R.B. OF F.S BRANCH AT Km. 80
Please refer Tender documents.
3 documents required · 3 mandatory
₹266
₹12,400
Yes
30 Jun 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
30 Jun 2026 - 7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches. | 90.67 | Cum | - | - |
| 2 | Providing and Laying Cement Concrete M-10 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 10.46 | Cum | - | - |
| 3 | M-150 Brick work in 1:3 (1Cement:3 Coarse Sand)cement mortar i/c all lead and lift.As directed by the Engineer-in-charge | 51.28 | cum | - | - |
| 4 | Providing and Laying Reinforced Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 8.03 | cum | - | - |
| 5 | Providing and Laying Cement Concrete M-20 and curing complete I/C all cost of material,labour and T.& P. etc. complete. As directed by the Engineer-in-charge | 1.29 | cum | - | - |
| 6 | Cutting, Bending, Binding cutting & Placing of reinforcement including binding wire also including cost of steel Fe 500.As directed by the Engineer-in-charge | 0.79 | M.T | - | - |
| 7 | Centering & Shuttering for R.C.C. work including cost of centering and shuttering up to 3 m height .As directed by the Engineer-in-charge | 29.73 | sqm | - | - |
| 8 | Struct Cement pointing in 1:2(1Cement:2 Coarse Sand) cement mortar.As directed by the Engineer-in-charge | 87.67 | sqm | - | - |
| 9 | Supplying & fixing PVC Pipe 50 mm dia with all cost of material,labour and T.& P. etc. complete.as directed by the Engineer-in-charge | 4 | No | - | - |
| 10 | E/W in filling for making bundha, diversion and embankment in ordinary soil.excavation to be in the form of regular pits and earth work in embankment to be in 20cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge. | 219.87 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.37 MB
BOQ_2184870.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid