| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC 6 160 A KANAKKANKUTTAI KOOLAIYUR GONUR PO METTUR TK SALEM DT PIN 636404 | METTUR | SALEM | TAMIL NADU | 636404 | ₹1.7 L Quoted ₹1.4 L | 1 | Accepted-AOC Lowest 1 |
| 2 | 2₹1.6 LRejected-AOC 5 132 SANTHAITHANAMPATTI ANDIKARAI GONUR METTUR DAM SALEM 636404 | METTUR DAM | SALEM | TAMIL NADU | 636404 | ₹1.6 L | 2 | Rejected-AOC Lowest 2 |
| Sl No | Description | Qty | Unit | KANNAN EARTH MOVERS& CONTRACTOR L2 | VVA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting with an initial lead of 10m and lift of 2m without damaging the nearby structure and dumping the excavated earth in the nearby area as directed by the Engineer at site including cost of all materials, all lead & lift, T&P's etc., complete., | 10 | 1 m3 (One Cubic Meter) | 120 ₹1,200 | 139 ₹1,390 |
| 2.00 | Providing PCC 1:4:8 mix using 40 mm HBG stone for foundation base concrete & floor concrete as directed by the department Engineer at site, including cost of all materials, all lead and lift, curing etc., complete. | 3.1 | 1 m3 (One Cubic Meter) | 5,400 ₹16,740 | 4,000 ₹12,400 |
| 3.00 | Providing PCC 1:2:4 mix using 20mm HBG metal for Drain floor as directed by the department Engineer in charge including cost of all materials, all labour charges, all lead, lift, curing etc., complete. | 1 | 1 m3 (One Cubic Meter) | 6,500 ₹6,500 | 4,998 ₹4,998 |
| 4.00 | Providing R.R masonry in CM 1:5 using R.R stones for foundation and basement as directed by the Engineer at site, including cost of all materials, curing, lead and lift etc., complete. | 5 | 1 m3 (One Cubic Meter) | 4,700 ₹23,500 | 4,500 ₹22,500 |
| 5.00 | Plastering the floor in CM 1:3, 20mm thick including cost of all materials, all Labour charges, curing, all lead & Lift, T&P etc., complete | 18 | 1 m2 (One Square Meter) | 500 ₹9,000 | 400 ₹7,200 |
| 6.00 | Providing Brick work in CM1:5 using 2nd Class ground moulded chamber burnt Bricks, including cost of all materials, all labour charges, all leads & lifts, all T&P's, curing etc., complete. | 5 | 1 m3 (One Cubic Meter) | 6,200 ₹31,000 | 6,300 ₹31,500 |
| 7.00 | Supplying, fabrication and erection of MS structural steel roof using MS hollow rectangular sections of approved sizes and thickness including cost of all materials, fabrication, erection charges, hire charges of welding machine, all labour charges, lead, lift etc., complete and as directed by the Engineer at site. | 0.25 | 1 MT (One Metric Tonne) | 1,18,000 ₹29,500 | 1,00,000 ₹25,000 |
| 8.00 | Supplying and fixing of colour coated metal roofing sheet of 0.47mm thick over MS structural steel frame with necessary screws for fixing and as directed by the Engineer at site including cost of all materials, all labour charges, scaffolding charges, safety appliances, lead, lift, all T&P's etc., complete | 23 | 1 m2 (One Square Meter) | 981 ₹22,563 | 990 ₹22,770 |
| 9.00 | Plastering in CM 1:5, 12mm thick for brick work inner and outer surfaces of all walls including cost of all materials, scaffolding charges, Labour charges, curing, Lead, Lift, T&P etc., complete | 44 | 1 m2 (One Square Meter) | 220 ₹9,680 | 250 ₹11,000 |
| 10.00 | Re-filling the basement with excavated earth to a required depth and as directed by the Engineer at site including cost of all materials, consolidation, all lead & lift, labour charges etc., complete. | 2 | 1 m3 (One Cubic Meter) | 35 ₹70 | 20 ₹40 |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
28 Jan 2026, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I - Civil Circle - Providing temporary shed in the East side of railway track line No.1 for points man using colour coated galvalume sheet roof near Railway yard office at CHP area of MTPS I
2026_EB_643813_1
CE / MTPS-I / SE/ CIVIL / OT.NO.80 / 2025-26
Open Tender
Civil Works
60 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹1,500
Yes
16 Mar 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
Earth work excavation in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting with an initial lead of 10m and lift of 2m without damaging the nearby structure and dumping the excavated earth in the nearby area as directed by the Engineer at site including cost of all materials, all lead & lift, T&P's etc., complete.,
Providing PCC 1:4:8 mix using 40 mm HBG stone for foundation base concrete & floor concrete as directed by the department Engineer at site, including cost of all materials, all lead and lift, curing etc., complete.
Providing PCC 1:2:4 mix using 20mm HBG metal for Drain floor as directed by the department Engineer in charge including cost of all materials, all labour charges, all lead, lift, curing etc., complete.
Providing R.R masonry in CM 1:5 using R.R stones for foundation and basement as directed by the Engineer at site, including cost of all materials, curing, lead and lift etc., complete.
Plastering the floor in CM 1:3, 20mm thick including cost of all materials, all Labour charges, curing, all lead & Lift, T&P etc., complete
Providing Brick work in CM1:5 using 2nd Class ground moulded chamber burnt Bricks, including cost of all materials, all labour charges, all leads & lifts, all T&P's, curing etc., complete.
Supplying, fabrication and erection of MS structural steel roof using MS hollow rectangular sections of approved sizes and thickness including cost of all materials, fabrication, erection charges, hire charges of welding machine, all labour charges, lead, lift etc., complete and as directed by the Engineer at site.
Supplying and fixing of colour coated metal roofing sheet of 0.47mm thick over MS structural steel frame with necessary screws for fixing and as directed by the Engineer at site including cost of all materials, all labour charges, scaffolding charges, safety appliances, lead, lift, all T&P's etc., complete
Plastering in CM 1:5, 12mm thick for brick work inner and outer surfaces of all walls including cost of all materials, scaffolding charges, Labour charges, curing, Lead, Lift, T&P etc., complete
Re-filling the basement with excavated earth to a required depth and as directed by the Engineer at site including cost of all materials, consolidation, all lead & lift, labour charges etc., complete.
Whitewashing two coats using white cement with approved quality to the interior and exterior cement plastered wall surfaces of building including preparing the surfces for painting, cost of all materials, scaffolding charges, thorough scrapping the surfaces, all labour charges, all lead &lift, curing, all safety appliances etc., complete.
Painting the MS Structural steels with two coats of enamel paint over one coat of primer of approved quality and colour including cost of all materials, all labour charges, all lead & lift etc., complete.
Providing RCC 1:11/2:3 mix using 20mm & 12mm downgraded metal for precast RCC slab including cost of all materials, all labour charges for finishing the top and sides of the slab, placing the slab in position, shuttering charges, curing the slab, all lead & lifts, disposing of damaged slabs, safety appliances etc., complete but excluding cost of reinforcement
Supplying, fabricating and fixing in position of M.S/RTS rods for the slabs as directed by the department Engineer at site including cost of material, all labour charges, all lead and lift, safety appliances etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_771453.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid