Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
28 May 2026, 12:00 pmClosed
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Interlocking work from the Jalalabad Police Outpost Road to Narayanpur in Development Block Jalalabad.
2026_REDUP_1147416_44
23/RED/Nivida file Shahjahanpur/E Nivida/2026-27 dated 02-04-2026
Open Tender
Civil Works - Roads
90 days
JALALABAD SHAHJAHANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹92,000
SE RED CIRCLE BAREILLY OFFICE
26 Jun 2026
13 May 2026
28 May 2026
13 May 2026
28 May 2026
13 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per technical specification clause 301.5 | 1,136 | Cum | 82.65 | ₹93,890.4 |
| 2 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 42.25 | Cum | 198.55 | ₹8,388.74 |
| 3 | Concrete with the 4 cm guage Brick Ballast,Fine Local sand of 1.25 F.M and cement in proportion of 12:6:1 in foundation and under floor including supply of all material and T&P etc. required for proper completion of the work as P.W.D S.I. No 273 | 229.43 | Cum | 3,724.78 | ₹8,54,576.28 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 172.08 | Cum | 4,779.5 | ₹8,22,456.36 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - II ( with 45-63 mm size stone ballast) As per technical specification clause 405. | 4.5 | Cum | 7,262.75 | ₹32,682.38 |
| 6 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 88.55 | Cum | 5,301 | ₹4,69,403.55 |
| 7 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 6.33 | Cum | 7,887.85 | ₹49,930.09 |
| 8 | Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge | 2,294.33 | Sqm | 831.25 | ₹19,07,161.81 |
| 9 | Supply & Fixing of Informatory Sign Board Rates Sanction SE/RED | 25.5 | Cum | 3,519.75 | ₹89,753.63 |
| 10 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 15.7 | Cum | 8,858.75 | ₹1,39,082.38 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
44-T2ofjalalabad.pdf
Tender Documents • 4.94 MB
BOQ_2148745.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid