| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹32.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹33.3 LRejected-AOC | ₹33.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹34.0 LRejected-AOC | ₹34.0 L | L3 | Rejected-AOC L3 |
| 4 | L4₹35.6 LRejected-AOC | ₹35.6 L | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical disqualified |
| Sl No | Description | Qty | Unit | M/S.J M Constructions L1 | M/S. VPK BUILDERS L3 | M/s. OM SAKTHI SEETHA ENGINEERING CONTRACTORS L4 | SRI RAJALAKSHMI ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.001.Providing Cement Concrete Road @ Ellappanaidupettai Village Kosathalai River Field road in Ellappanaidupettai Panchayat VPR (R - 405) | |||||||
| 2.00 | Earth Work Excavation depositing on Bank with initial lead and lift etc complete as per SS 20B | 90 | CUM | 116.06 ₹10,445.4 | 123.48 ₹11,113.2 | 129.25 ₹11,632.5 | 108 ₹9,720 Lowest |
| 3.00 | Cement Conctrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 36 | CUM | 4,922.76 ₹1,77,219.36 Lowest | 5,272.5 ₹1,89,810 | 5,482.15 ₹1,97,357.4 | 5,190 ₹1,86,840 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material | 300 | CUM | 2,586.81 ₹7,76,043 Lowest | 2,771 ₹8,31,300 | 2,880.76 ₹8,64,228 | 2,800 ₹8,40,000 |
| 5.00 | Centring charges for C.C Work | 560 | SQM | 120.45 ₹67,452 Lowest | 128 ₹71,680 | 134.14 ₹75,118.4 | 135 ₹75,600 |
| 6.00 | Cement Conctrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 60 | CUM | 5,583.69 ₹3,35,021.4 | 5,980 ₹3,58,800 | 6,218.18 ₹3,73,090.8 | 5,200 ₹3,12,000 Lowest |
| 7.00 | Cement Conctrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 220 | CUM | 6,058.88 ₹13,32,953.6 Lowest | 6,389 ₹14,05,580 | 6,747.38 ₹14,84,423.6 | 6,300 ₹13,86,000 |
| 8.00 | Supply of Bitumen pads. | 44 | RM | 206.18 ₹9,071.92 Lowest | 220.5 ₹9,702 | 229.61 ₹10,102.84 | 234 ₹10,296 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 4,87,477.2 ₹4,87,477.2 Lowest | 5,18,037.34 ₹5,18,037.34 | 5,42,871.64 ₹5,42,871.64 | 5,07,682.08 ₹5,07,682.08 |
Tender Value
₹36.7 L
EMD Value
₹37,000
Closing Date
8 Jun 2026, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
Providing Cement Concrete road at Ellappanaidupetai Village Kosasthalai River Field road in Ellappanaidupettai Panchayat VPR(R-405) Poondi Block under CGF Savings and interest Fund
2026_RDTN_678139_1
1785/2026/A7 dt.23.05.2026
Open Tender
Civil Works - Roads
Item Rate
120 days
Poondi Block
Class V and above
5 documents required · 5 mandatory
₹0
₹37,000
Yes
DRDA Tiruvallur
24 Jun 2026
25 May 2026
8 Jun 2026
25 May 2026
8 Jun 2026
27 May 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Providing Cement Concrete Road @ Ellappanaidupettai Village Kosathalai River Field road in Ellappanaidupettai Panchayat VPR (R - 405) | - | - | - | - |
| 2 | Earth Work Excavation depositing on Bank with initial lead and lift etc complete as per SS 20B | 90 | CUM | 131.89 | ₹11,870.1 |
| 3 | Cement Conctrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 36 | CUM | 5,594.04 | ₹2,01,385.44 |
| 4 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material | 300 | CUM | 2,939.56 | ₹8,81,868 |
| 5 | Centring charges for C.C Work | 560 | SQM | 136.88 | ₹76,652.8 |
| 6 | Cement Conctrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 60 | CUM | 6,345.09 | ₹3,80,705.4 |
| 7 | Cement Conctrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 220 | CUM | 6,885.09 | ₹15,14,719.8 |
| 8 | Supply of Bitumen pads. | 44 | RM | 234.3 | ₹10,309.2 |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tech_bid_poondi.pdf
Tender Documents • 0.47 MB
PRICE_BID-Poondi.pdf
Additional Documents • 0.19 MB
BOQ_814754.xls
BOQ • 0.34 MB
Corrigendum-.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].