Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹2.9 L+₹1,337.64 (0.46%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.6 L
EMD Value
₹7,300
Closing Date
25 Sept 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer Saryu Nahar Khand 7 Balrampur
As per Tender Notice
2024_UPIDC_952380_2
01/EE/2024-25
Open Tender
Civil Works - Canal
Item Rate
30 days
Balrampur
As per Tender Notice
2 documents required · 2 mandatory
₹354
₹7,300
Yes
Balrampur
6 Nov 2024
5 Sept 2024
25 Sept 2024
5 Sept 2024
25 Sept 2024
5 Sept 2024
19 Sept 2024
Amount
Construction of Tail Fall at km 2.300 of Shankarpur Mr.
Earth work in excavation of all types of soil incl lead of upto 30.0 m and lift upto 3.0 m and dispposal of surplus soil to spoil bank and manual compaction & dressing to profile required for proper completion of work incl cost of all T&P, labour etc .
Earth work incl lead of upto 30.0 m and lift upto 1.5 m mechanical compaction but manual compaction & dressing to profile required for proper completion of work incl cost of all T&P, labour etc .
Supply of Local sand for foundation required for proper completion of work including cost of all material, labour and t&p.etc
Dewatering in structure for proper completion of work incl cost of all material, labour T&P etc.
Centering and shuttering for CC/RCC work in different part of structure in DY & Mr of RMC for proper completion of work incl cost of all material, labour T&P etc.
Laying Cement Concrete M-10 in foundation in DY & Mr of RMC with cement OPC 43 , coarse sand FM not less than 2.0 and hard 20-40 mm size stone, lead 60mtr & lift 3.0 mtr for proper completion of work incl cost of all material, labour T&P etc.
Laying Cement Concrete M-15 with cement OPC 43 , coarse sand FM not less than 2.0 and hard 20-40 mm size stone, required for proper completion of work including cost of all material, labour and t&p.etc
Brick work in 1:4 cement mortar (1 cement OPC 43 : 4 coarse sand )and brick M-150 in DY & Mr of RMC including cost of all material labour T&P etc. completion of work
Dry brick pitching 230mm thick in DY & Mr of RMC for proper completion of work incl cost of all material, labour T&P etc.
Cement pointing of 1 :2 cement mortar struck deep with cement OPC 43, coarse sand FM not more than 2.0 ) in DY & Mr of RMC including cost of all material labour T&P etc. completion of work
Supply and laying filter material 10 to 20 mmstone grit below boulder pitching incl cost of all material labour T&P etc. completion of work
SHASHANK SINGH
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .