Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.0 L
EMD Value
₹14,100
Closing Date
12 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Balance work of Pahreta minor and construction of VRB at km 1.530
2026_UPIDC_1109855_9
05/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹14,100
20 Feb 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W excation in foundation M.K.R. soil including all lead and lift as per proper completion of work.
R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work.
Laying RC.C. 1:1:2 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work.
Steel Reinforcement for RCC work including cutting, bending, binding with GI wire and placing in position with cost of steel reinforcement.
Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work.
Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work.
Laying and fixing joint filler bond 20 mm including cost of cealing compound cost of labour etc required for completion of work.
Providing and fixing drainage spout pipe of GI 100 mm dia including cost of labour T&P etc required for completion of work.
E/W in filling for including machanical compaction dressing and watering with all lead and lifts and T&P etc with proper completion of work.
E/W in back filling with all cost of labour, material, T&P etc with proper completion of work.
Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work.
Laying C.C. 1:2:4 with all cost of labour, material and T&P etc for making approach slab of VRB required for completion of work.
Laying C.C. 1:3:6 (M10) with all cost of labour, material and T&P etc required for completion of work.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.34 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.23 MB
Nit05.pdf
Tender Documents • 3.23 MB
BOQ_2049736.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .