Loading…
Loading…
Tender Value
₹9.3 L
EMD Value
₹18,651
Closing Date
2 Sept 2026, 11:00 am
Executive Enginner
O/o Executive Engineer WSS Div No. 3 Jal
Construction Of Plastic Waste Management Unit Material Recovery Facility For Village Poonia Block Shahkot Distt Jalandhar appx Internal size 100 mt x 7.50 mt Civil Works Steel Structure works Electrical works and Public Health works Under SBM G
2026_WSS_171930_1
Const.Of Plastic Waste Management Unit Material Recovery Facility For Vill Poonia Block Shahkot
Open Tender
Civil Works
Percentage
60 days
IN VILLAGE Poonia
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹18,651
O/o Executive Engineer WSS Div No. 3 Jal
2 Sept 2026
16 Jul 2026
3 Sept 2026
16 Jul 2026
2 Sept 2026
16 Jul 2026
16 Jul 2026 - 23 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 18.83 | Cum. | 35.82 | ₹674.49 |
| 2 | Cement concrete 1:5:10 with 40 mm stone ballast using concrete mixing volumetric type | 4.03 | Cum. | 3,604.02 | ₹14,524.2 |
| 3 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 6.05 | Sqm. | 221.24 | ₹1,338.5 |
| 4 | Centering and shuttering for sides and soffits of beam,
beams, launching girders, bressumers, lintels. | 25.6 | Sqm. | 400.33 | ₹10,248.45 |
| 5 | Centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 2.04 | Sqm. | 560.46 | ₹1,143.34 |
| 6 | Damp proof course 4cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kg per sqm laid hot and sanded | 11.43 | sqm | 348.71 | ₹3,985.76 |
| 7 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 12.38 | cum | 5,197.97 | ₹64,350.87 |
| 8 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 13.25 | cum | 5,426.58 | ₹71,902.19 |
| 9 | 115 mm thick brick wall with every fourth course laid in 1:4 cement mortar in superstructure | 33.83 | sqm | 674.24 | ₹22,809.54 |
| 10 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 1.06 | cum | 5,428.69 | ₹5,754.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Pooniandnit.pdf
Tender Documents • 1.84 MB
BOQ_349737.xls
BOQ • 0.42 MB
tendernotice.pdf
Tender Documents • 0.34 MB
corrigendum03.pdf
PDF • 0.45 MB
CORRIGENDUM02.pdf
PDF • 0.35 MB
poonia.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].