Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹45.9 L
EMD Value
₹46,000
Closing Date
25 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Sivagangai Block in Sivagangai District - Package No. 74
2022_RDTN_247507_1
74_Pack_AGAMT II 21-22/SVG
Open Tender
Civil Works
Item Rate
30 days
SIVAGANGAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹46,000
5 Sept 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
Amount
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Construction of Sluice
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:</br>In cement mortar
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.</br>Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0.0 to 0.30m
Cement concrete 1:4:8 mix using 40 mm IS specified grading and mixing by mixer machine including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts vibrating, compacting and finishing the surface watering, curing including the cost components of providing rigid and smooth steel centering and strutting wherever necessary for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the Engineer and complying with standard specification.
Providing Centering and Chuttering including cost and conveyance of country wood and labour charges etc., Complete
Cement concrete 1:2:4 mix using 20 mm IS specified grading and mixing by mixer machine including dewatering by bailing/pumping wherever necessary laying the concrete in layers and in bays with all leads and lifts vibrating, compacting and finishing the surface watering, curing including the cost components of providing rigid and smooth steel centering and strutting wherever necessary for various depth and height below and above ground level so as to attain the profile and strength specified in the drawings as per the direction of the Engineer and complying with standard specification..
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete (pg no : 32) PWD Schedule of rates
Construction Of Inlet
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Laying and Supply of R.C.C Pipe
CONSTRUCTION OF RETAINGWALL
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil S
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete (pg no : 32) PWD Schedule of rates
Construction of Inlet
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Laying and Supply of R.C.C Pipe
CONSTRUCTION OF RETAINGWALL
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Improvements of oorkavalan koil Oorani @ Mulakulam Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete (pg no : 32) PWD Schedule of rates
Construction of Inlet
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Laying and Supply of R.C.C Pipe
CONSTRUCTION OF RETAINGWALL
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete (pg no : 32) PWD Schedule of rates
Construction of Inlet
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply of NP3 pipe including suitabel collars including cost and conveyance at site etc., complete.
Laying and Supply of R.C.C Pipe
CONSTRUCTION OF RETAINGWALL
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Construction of Bathing Ghat
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Supplying and filling with Sand for foundation and basement layers of not more than 15cm thick well rammed and watering Complying with standard specification
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Providing Centering charges for C.C works including material all labour charges etc.,completed.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A PR V K AND COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .