Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 CrAccepted-AOC FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | L1 | Accepted-AOC Being Reasonable And Accepted | |
| 2 | L2₹9.2 Cr+₹97.3 L (11.8%)Rejected-AOC B 2 21 SECTOR F JANKIPURAM LUCKNOW UTTAR PRADESH 226021 | LUCKNOW | UTTAR PRADESH | 226021 | L2 | Rejected-AOC Other Than L1 | |
| 3 | L3₹9.5 Cr+₹1.3 Cr (15.2%)Rejected-AOC 223 3 E B 1 MALTI TOWER TARABAI PARK KOLHAPUR 416 003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | L3 | Rejected-AOC Other Than L1 | |
| 4 | L4₹9.8 Cr+₹1.6 Cr (19.2%)Rejected-AOC 61 LAALA LAJPAT RAI COLONY BHOPAL M P 462023 | BHOPAL | MADHYA PRADESH | 462023 | L4 | Rejected-AOC Other Than L1 | |
| 5 | L5₹10.0 Cr+₹1.7 Cr (20.9%)Rejected-AOC C 301 SHREE BALAJI RESIDENCY BEHIND SANGATH SILVER APARTMENT SABARMATI GANDHINAGAR HIGHWAY MOTERA AHMEDABAD 380005 | AHMEDABAD | AHMEDABAD | GUJARAT | 380005 | L5 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | Hariom Projects Pvt Ltd L5 | Horizon Construction L1 | M/s S. R. Constructions L7 | D R CONSTRUCTION L3 | SALDAR INFRASTRUCTURE & CONTRACTS PRIVATE LIMITED L2 | D S MADANE ENGINEERS AND CONTRACTORS L6 | SHREE KRISHNA INFRASTRUCTURE L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCH 'A' PART-I ( BUILDING/STRUCTURES) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | ||||||||||
| 1.10 | Design and construction of multipurpose training shed (Shed-1) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge | 1 | EACH BLOCK | 4,50,00,000 ₹4,50,00,000 | 3,61,50,000 ₹3,61,50,000 | 4,50,00,000 ₹4,50,00,000 | 4,19,00,000 ₹4,19,00,000 | 3,61,00,000 ₹3,61,00,000 Lowest | 4,45,00,000 ₹4,45,00,000 | 4,50,00,000 ₹4,50,00,000 |
| 1.20 | Design and construction of multipurpose training shed (Shed-2) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge
Note: | 1 | EACH BLOCK | 4,50,00,000 ₹4,50,00,000 | 3,61,50,000 ₹3,61,50,000 Lowest | 4,50,00,000 ₹4,50,00,000 | 4,19,00,000 ₹4,19,00,000 | 3,93,00,000 ₹3,93,00,000 | 4,45,00,000 ₹4,45,00,000 | 4,50,00,000 ₹4,50,00,000 |
| 2.00Schedule ‘A’ Part-II to IX Note: This schedule is pre-priced by MES and the rate indicated under Col 5 signifies this fact only | ||||||||||
| 2.01 | Total amount of Sch 'A' Part-II ( SITE CLEARANCE, EXCAVATION AND EARTH WORK ) | 1 | LUMP SUM | 15,50,000 ₹15,50,000 | 15,69,000 ₹15,69,000 | 14,50,000 ₹14,50,000 | 18,50,959.08 ₹18,50,959.08 | 20,00,000 ₹20,00,000 | 15,68,609.39 ₹15,68,609.39 | 10,80,000 ₹10,80,000 Lowest |
| 2.02 | Total amount of Sch 'A' Part-III (Internal Electrification) | 1 | LUMP SUM | 6,50,000 ₹6,50,000 | 9,09,000 ₹9,09,000 | 6,35,000 ₹6,35,000 | 5,67,638 ₹5,67,638 | 8,00,000 ₹8,00,000 | 6,62,000 ₹6,62,000 | 5,40,000 ₹5,40,000 Lowest |
| 2.03 | Total amount of Sch 'A' Part-IV (Road, Path and Culvert) | 1 | LUMP SUM | 9,50,000 ₹9,50,000 | 9,42,500 ₹9,42,500 | 10,50,000 ₹10,50,000 | 11,11,967.54 ₹11,11,967.54 | 15,00,000 ₹15,00,000 | 11,77,500 ₹11,77,500 | 9,00,000 ₹9,00,000 Lowest |
| 2.04 | Total amount of Sch 'A' Part-V (Sewage Disposal) | 1 | LUMP SUM | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,00,000 | 2,25,000 ₹2,25,000 | 2,35,799.01 ₹2,35,799.01 | 4,00,000 ₹4,00,000 | 2,49,787 ₹2,49,787 | 1,98,000 ₹1,98,000 Lowest |
| 2.05 | Total amount of Sch 'A' Part-VI (Area Drainage) | 1 | LUMP SUM | 28,00,000 ₹28,00,000 | 27,62,500 ₹27,62,500 | 28,00,000 ₹28,00,000 | 30,93,948.73 ₹30,93,948.73 | 41,71,000 ₹41,71,000 | 34,53,067 ₹34,53,067 | 23,40,000 ₹23,40,000 Lowest |
| 2.06 | Total amount of Sch 'A' Part-VII (External Electric Supply) | 1 | LUMP SUM | 2,65,000 ₹2,65,000 | 4,21,300 ₹4,21,300 | 2,50,000 ₹2,50,000 | 3,93,845.86 ₹3,93,845.86 | 5,00,000 ₹5,00,000 | 2,46,980 ₹2,46,980 | 2,25,000 ₹2,25,000 Lowest |
Tender Value
₹10.5 Cr
EMD Value
₹8.5 L
Closing Date
16 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
PROVN OF 02 MULTIPURPOSE TRAINING SHEDS AT KHADAKWASLA UNDER GE (P) NDA.
2026_MES_781313_1
84689
Open Tender
Civil Works
Lump-sum
450 days
Garrison Engineer (P) NDA
Class S and Category a(i)
7 documents required · 7 mandatory
₹3,000
Garrison Engineer (P) NDA
₹8.5 L
Yes
5 Nov 2026
30 Jul 2026
23 Sept 2026
30 Jul 2026
16 Sept 2026
9 Sept 2026
31 Jul 2026 - 7 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCH 'A' PART-I ( BUILDING/STRUCTURES) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | |||||
| - | Design and construction of multipurpose training shed (Shed-1) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge | 1 | EACH BLOCK | - | - |
| - | Design and construction of multipurpose training shed (Shed-2) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge
Note: | 1 | EACH BLOCK | - | - |
| 2Schedule ‘A’ Part-II to IX Note: This schedule is pre-priced by MES and the rate indicated under Col 5 signifies this fact only | |||||
| 2.01 | Total amount of Sch 'A' Part-II ( SITE CLEARANCE, EXCAVATION AND EARTH WORK ) | 1 | LUMP SUM | 47,96,974.64 | ₹47,96,974.64 |
| 2.02 | Total amount of Sch 'A' Part-III (Internal Electrification) | 1 | LUMP SUM | 5,30,503.7 | ₹5,30,503.7 |
| 2.03 | Total amount of Sch 'A' Part-IV (Road, Path and Culvert) | 1 | LUMP SUM | 9,78,771.54 | ₹9,78,771.54 |
| 2.04 | Total amount of Sch 'A' Part-V (Sewage Disposal) | 1 | LUMP SUM | 2,69,238.75 | ₹2,69,238.75 |
| 2.05 | Total amount of Sch 'A' Part-VI (Area Drainage) | 1 | LUMP SUM | 27,76,721.47 | ₹27,76,721.47 |
| 2.06 | Total amount of Sch 'A' Part-VII (External Electric Supply) | 1 | LUMP SUM | 1,97,584.8 | ₹1,97,584.8 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.78 MB
84689-Multi-Shed-NDA-IFA.pdf
Tender Documents • 18.40 MB
CEPZ-88-TD-14M SHT 3-3.pdf
Additional Documents • 0.42 MB
CEPZ-88-TD-15M SHT 1-1.pdf
Additional Documents • 0.37 MB
CEPZ-89-TD-15M (SHT NO-1.1).pdf
Additional Documents • 0.61 MB
CEPZ-91-TD-7M SHT 1-1.pdf
Additional Documents • 7.75 MB
CEPZ-91-TD-8M SHT 2-2.pdf
Additional Documents • 0.15 MB
CEPZ-91-TD-19M SHT 1-1.pdf
Additional Documents • 5.48 MB
CEPZ-91-TD-24M SHT 1-1.pdf
Additional Documents • 5.47 MB
CEPZ-92-TD-11M SHT 1-2.pdf
Additional Documents • 5.49 MB
CEPZ-92-TD-11M SHT 2-2.pdf
Additional Documents • 5.48 MB
CEPZ-93-TD-20M SHT 1-1.pdf
Additional Documents • 5.43 MB
CEPZ-93-TD-22M SHT 1-1.pdf
Additional Documents • 5.47 MB
CEPZ-97-TD-6-STR SHT 1-1.pdf
Additional Documents • 0.52 MB
AFBTD2282018(S)-1R-1.pdf
Additional Documents • 0.92 MB
CEPZ-88-TD-4M SHT 1-4.pdf
Additional Documents • 4.63 MB
CEPZ-88-TD-4M SHT 2-4.pdf
Additional Documents • 4.64 MB
CEPZ-88-TD-4M SHT 3-4.pdf
Additional Documents • 4.63 MB
CEPZ-88-TD-4M SHT 4-4.pdf
Additional Documents • 4.63 MB
CEPZ-88-TD-9M SHT 1-2.pdf
Additional Documents • 4.68 MB
CEPZ-88-TD-9M SHT 2-2.pdf
Additional Documents • 0.47 MB
CEPZ-88-TD-11M SHT 1-1.pdf
Additional Documents • 0.52 MB
CEPZ-88-TD-14M SHT 1-3.pdf
Additional Documents • 0.41 MB
CEPZ-88-TD-14M SHT 2-3.pdf
Additional Documents • 0.44 MB
CEPZ-2024-TD-05 (SHT NO- 1.1) .pdf
Additional Documents • 0.09 MB
CEPZ-98-TD-6 SHT NO 1-2.pdf
Additional Documents • 0.22 MB
CEPZ-98-TD-6 SHT NO 2-2.pdf
Additional Documents • 0.22 MB
CEPZ-2001-TD-02 SHT NO 1-1.pdf
Additional Documents • 0.18 MB
CEPZ-2001-TD-03-STR (SHT 1.1).pdf
Additional Documents • 0.08 MB
CEPZ-2001-TD-06 SHT NO 1-2.pdf
Additional Documents • 0.23 MB
CEPZ-2001-TD-06 SHT NO 2-2.pdf
Additional Documents • 0.16 MB
CEPZ-2010-TD-06 (SHT 1.3)0001.pdf
Additional Documents • 5.05 MB
CEPZ-2010-TD-06 (SHT 2.3)0001.pdf
Additional Documents • 4.02 MB
CEPZ-2010-TD-06 (SHT 3.3)0001.pdf
Additional Documents • 5.61 MB
CEPZ-2019-TD-01 (SHT 1.2).pdf
Additional Documents • 0.15 MB
CEPZ-2019-TD-01 (SHT 2.2).pdf
Additional Documents • 0.14 MB
CEPZ-2019-TD-03 (SHT 1.2).pdf
Additional Documents • 0.14 MB
CEPZ-2019-TD-03 (SHT 2.2).pdf
Additional Documents • 0.06 MB
CEPZ-2021-SF(TD)-04 (SHT NO- 1.1).pdf
Additional Documents • 0.62 MB
CEPZ-2023-TD-03 (SHT NO- 1-4).pdf
Additional Documents • 0.73 MB
CEPZ-2023-TD-03 (SHT NO- 2-4).pdf
Additional Documents • 0.76 MB
CEPZ-2023-TD-03 (SHT NO- 3-4).pdf
Additional Documents • 0.75 MB
CEPZ-2023-TD-03 (SHT NO- 4-4).pdf
Additional Documents • 0.55 MB
CEPZ-2024-TD-01 (SHEET 1-1).pdf
Additional Documents • 0.35 MB
CEPZ-2024-TD-03-SHEET - 01 OF 01.pdf
Additional Documents • 0.25 MB
BOQ_875257.xls
BOQ • 0.61 MB
CEPZ-2026-KDK-22-SHEET 01 OF 03.pdf
Additional Documents • 0.75 MB
CEPZ-2026-KDK-22-SHEET 02 OF 03.pdf
Additional Documents • 0.40 MB
CEPZ-2026-KDK-22-SHEET 03 OF 03.pdf
Additional Documents • 0.41 MB
Amendment.pdf
PDF • 0.26 MB
Amendment.pdf
PDF • 0.26 MB
Amendment.pdf
PDF • 0.09 MB
84689-date.pdf
PDF • 0.29 MB
84689-date.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .