| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹13.7 L+₹1.4 L (11.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹17.5 L+₹5.1 L (41.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹21.6 L+₹9.2 L (74.8%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L1 | B P ENTERPRISES L4 | M/S P.K. Enterprises L2 | D N S ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00Survey of Substations (Yearly per Substation) | |||||||
| 1.01 | Checking of Incoming & outgoing VCB Panel working and parts on Quarterly basis (once in a three (03) month) | 26 | No | 3,000 ₹78,000 | 2,500 ₹65,000 | 2,305 ₹59,930 Lowest | 3,000 ₹78,000 |
| 2.00Work | |||||||
| 2.01 | Complete overhauling of Panel, insulation of busbar with HT Tape, Empire Tape and cleaning of spouts | 12 | Job | 3,000 ₹36,000 | 2,500 ₹30,000 | 1,540 ₹18,480 Lowest | 3,000 ₹36,000 |
| 2.02 | Complete Overhauling of Trolley and Manual and Motorised charging mechanism. | 26 | Job | 1,000 ₹26,000 Lowest | 1,400 ₹36,400 | 1,540 ₹40,040 | 1,800 ₹46,800 |
| 2.03 | Repairing and adjusting of Tripping Assembly and circuit. | 26 | Job | 1,000 ₹26,000 Lowest | 1,400 ₹36,400 | 1,540 ₹40,040 | 1,500 ₹39,000 |
| 2.04 | Repairing and adjusting of Closing Assembly and circuit. | 26 | Job | 1,000 ₹26,000 Lowest | 1,400 ₹36,400 | 1,540 ₹40,040 | 1,500 ₹39,000 |
| 2.05 | Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB. | 12 | Job | 1,000 ₹12,000 Lowest | 1,000 ₹12,000 Lowest | 2,305 ₹27,660 | 1,500 ₹18,000 |
| 2.06 | Replacement and Adjustment of Vacuum Interrupter | 36 | Job | 1,000 ₹36,000 Lowest | 1,000 ₹36,000 Lowest | 2,305 ₹82,980 | 1,500 ₹54,000 |
| 2.07 | Repairing and Adjusting of shutter Assembly | 12 | Job | 1,000 ₹12,000 Lowest | 1,850 ₹22,200 | 1,540 ₹18,480 | 2,000 ₹24,000 |
Tender Value
₹22.5 L
EMD Value
₹22,500
Closing Date
27 Jan 2026, 11:00 amClosed
Superintending Engineer
Ist Floor 33/11 KV Civil Lines Substation, Civil Line Prayagraj
Repairing and complete overhauling of V.C.B., Control Panel, Relay and Testing of T/F installed at 33/11 KV Sub Station under EUDC-II, Prayagraj
2026_PVVNV_1107459_1
24/EUDC-II/PYG/SE/2025-26
Open Tender
Electrical Works
Lump-sum
365 days
Prayagraj
As per Tender Specification
2 documents required · 2 mandatory
₹3,540
S.E. EUDC-II, Prayagraj
₹22,500
3 Feb 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
Survey of Substations (Yearly per Substation)
Checking of Incoming & outgoing VCB Panel working and parts on Quarterly basis (once in a three (03) month)
Complete overhauling of Panel, insulation of busbar with HT Tape, Empire Tape and cleaning of spouts
Complete Overhauling of Trolley and Manual and Motorised charging mechanism.
Repairing and adjusting of Tripping Assembly and circuit.
Repairing and adjusting of Closing Assembly and circuit.
Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB.
Replacement and Adjustment of Vacuum Interrupter
Repairing and Adjusting of shutter Assembly
Repairing and Adjusting of Interlocks
Servicing and adjusting of Spring charging Motor
Repairing of spouts with complete cleaning and adjusting
Complete cleaning of trench, tightening of cable boxes with rerouting of cable
Complete wiring of Pannels with checking of fuse and indicators
Complete testing of Tripping system of Breaker for successful Tripping
Replacement of Damage CT/PT Including Wiring
Supply of Spare + Sundry Cost (Provided By Contractor)
Cam Shaft Assembly
Charging Motor Rectifier
Charging Spring
HRC Fuse 3.15 Amp
Indicators
Flexible Connections
Charging Gear Big with Bearing
Charging Gear Small with Bearing
Insulated Housing Assembly for VI
Tulip contact
Upper Terminal Assembly
Lower Terminal Assembly
Rack In Gear
Tripping Coil 24V
Tripping Plate
Rack out Gear
Copper Wire 1.5 mm
Crank Assembly
Drive Shaft
Charging Handle
I/O Spout Set Busbar Side
I/O Spout Set CT Side
Closing Assembly
Closing Coil (24 V DC)
TNC Switch
Pla Relay
Terminals
Limit Switches
HRC Fuse 2A, 6A
Charging Motor
Vacuum Interrupter of different make
Support Insulator
Copper Strip Busbar (3 Phase for 1 Meter)
Auxiliary Switch
MCB 32AMP, 3P
Space Heter
Thermostate
Ampere Meter
Volt Meter
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
Tender_No_24.rar
Tender Documents • 0.13 MB
BOQ_2043908.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .