Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.3 LAccepted-AOC 302 SIDDHIVINAYAK APPT A WING MUMBAI K K MARG JACOB CIRCLE MUMBAI CITY MAHARASHTRA 400 011 | MUMBAI | MAHARASHTRA | 400011 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹60.4 L+₹9.8 L (19.5%)Rejected-Finance | L2 | Rejected-Finance Being other than Lowest | |
| 3 | L3₹69.6 L+₹19.1 L (37.7%)Rejected-Finance GE W COLABA MUMBAI | CHANDRAPUR | MAHARASHTRA | 441205 | L3 | Rejected-Finance Being other than Lowest | |
| 4 | L4₹77.6 L+₹27.1 L (53.7%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance Being other than Lowest |
Tender Value
Refer Docs
Closing Date
10 May 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE NW MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
STRUCTURAL REPAIR AND ALLIED MAINT SERVICES FOR OTM/MD ACCN AT OUTLAYING AREA UNDER GE (NW) NOFRA COLABA MUMBAI
2021_MES_433642_1
8668/CWE(NW)/MUMBAI
Open Tender
Civil Works
Item Rate
180 days
GE (NW) NOFRA
Class C and above
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) NOFRA
Exempted
28 Jun 2021
30 Mar 2021
12 May 2021
30 Mar 2021
10 May 2021
28 Apr 2021
30 Mar 2021 - 20 Apr 2021
60 days
Amount
Taking down cement or cement lime plaster of any description on brick or stone walls, etc including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for chipping , removing carefullly concrete work by low impact hammer, breakar without damaging the structure & cleaning and disposal of debris out side the premises etc. complete all as specified and directed by Engineer-in-Charge. Hard concrete should not be removed by force.
From GL floor to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Demolition of reinforced cement concrete of any description and in any position (reinforcement cut as required to facilitate demolition whenever required), complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Demolition of brick work or stone masonary built in cement mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for brick work with sub class "B" bricks, straight or curved on plan exc 6m mean radius, built in CM (1:4), complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for cleaning existing reinforcement with wire/ rotary wire brush, making the surfaces free from loose material dirt etc. complete and applying two coats of alkaline rust converting primer FEOVERT of Krishna Conchem or Roff rust cleaner of Piddilite or Dr. Fixit Rust removal or ShaliRust of STP Ltd. on the rebars, including cleaning the reinforcement, wirebrushing to remove loose rust spalls, wash the rebars with clean water within 3 min and wipe it dry all as per manufacturer's instructions complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for replacement of steel reinforcement with TMT bars of appropriate size where 30% of cross section is reduced including dismantling of rusted steel complete all as specified and directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for carry out application of Bi-polar migratory corrosion inhibitor EPCO-KP-100/ Protectsil CIT/Ferogard 903 on concrete surface (this inhibitor shall have migratory kind of properly which permits the material to migrate to a virtual extent of 100 mm, through pores of concrete, inhibitor the corrosion and de-passivating the Electro-chemical reaction. It should have properly to attack as well as cathode, which is purely alkaline in nature (pH-9.5), So it has no carcinogen activity with concrete all as per manufacturer's instructions complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for Drilling and fixing Rohibb Teflon nozzles in RCC members, including drilling holes of 12mm dia, 50 to 100mm deep holes. Works shall be carried out as under :- (i) Cleaning of holes. Clean the holes by air blower prior to fixing nozzles. (ii) Fixing of nozzles. Insert 12mm dia. Rohibb Teflon nozzles in cleaned holes. External end of nozzles to be machine to receive outlet of grouting gun.Fix it inside the holes by applying thixotropic epoxy putty to ensure complete sealing. Cure the system for minimum 12 hrs. (iii) Cutting of nozzles. Cut the nozzles by chisel after completion of grouting without damaging structural elements. (iv) In case crack upto 2mm wide, fix the injection nozzels directly over the cracks, at intervals of 6 to 9 inches, using a drilling machine. Fix PVC/MS nozzels in these holes with fast-setting epoxy putty & let it dry for 2 to 3 days. Also, seal the crack between the ports with epoxy putty. (v) In case where the crack is wider than 2mm upto 4 to 5mm, drill holes at the sides of the crack in a staggered fashion, at intervals of 6 inches and affix them with epoxy putty as mentioned above. (vi) Also, seal the face of the crack with a liberal application of the epoxy putty. Make Dr Fixit, STP, Choksy Chemical as approved
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for Injecting of site cement slurry grout, in the ratio 1:2 (1-cement 2-water) including super plasticizer (supercom-100) 250 ml/50 Kgs. Mixing shall be done by mechanical mixer continuously stirring mechanically to keep cement particles in suspension. Injection of approved/specified grout by means of pump at a pressure of 0.5 Kg/cm2 till the grout mix flow out from the nozzle indicating complete filling of grout in the holes drilled complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for Injecting low viscosity MONOPOL (3-5 cps) high molecular weight monomer by pressure and using mechanized injector gun with accessories till nozzles refuses to accept the grout, including, mixing of material mixing of material components(part a & b) in the required quantities as per manufacture`s instruction by weigh batching, Grouting maintain the pressure at exit(0.5 to 1.0 kg/cm2) by monitoring pressure gauge at exit grout the material through prefixed nozzles in the structural elements@100ml per nozzle Repeat the process for all the nozzles. (Beam, RCC wall and columns) complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster confirming to ASTM-C-882-91 (Arizona slant shear test) to ensure bond between old concrete and new concrete complete all as per manufacturer's instructions and as directed by Engineer-in-Charge Make :- Krishna Conchem, Dr Fixit, Fosroc as approved
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for building up the profile of structural member by using latex additives (MONOBOND) modified air cured motor system (Polymer modified motor/LW+) (1:5:15 = 1 monobond-5 cement -15 sand) -in damaged area in 30mm thickness including leveling profiling etc complete all as per manufacturer's instructions and as directed by Engineer-in-Charge Make :- Dr Fixit, Sita, STP, Fosroc as approved
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for providing and applying jacketing around columns with Micro concrete (Molith-MC) M40 including all lifts, shuttering, drilling holes and fixing shear anchor as per specification complete. Note :- Reinforcement shall be measured and paid separately rates quoted shall be inclusive of jacketing, formwork and micro concrete etc complete all as specified and as directed. Make :- Dr Fixit, STP, Fosroc as approved by GE.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for rendering 15 mm thick in CM (1:4) on external brick work or concrete surfaces finished even and fair complete all as specified and as directed by Engg-In Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for rendering 15 mm thick in CM (1:4) on external brick work or concrete surfaces finished even and fair complete all as specified and as directed by Engg-In Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for 20mm thick plastering in cement & sand mortar 1:4 in 2 coats (15 mm thick backing coat and 5 mm thick setting coat mixed with water proofing compound) on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement complete all as specified and as directed. Note :- WPC shall be mesured and paid seperately.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for preparation of newly plastered wall surfaces, over 10cm girth & applying two coats of water proof paint (rain coat of Dr. fixit or equivalent in STP, Fosroc, Krishna as approved) over a coat of Dr. Fixit primeseal or equivalent in STP, Fosroc, Krishna as approved or wall primer complete all as specified and as per manufacturer's instruction.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for rendering 15mm thick cement plaster in CM 1:6 on fair faces of brick work/concrete surfaces finished even and smooth without using extra cement complete all as specified and directed
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for rendering 15mm thick cement plaster in CM 1:6 on fair faces of brick work/concrete surfaces finished even and smooth without using extra cement by using synthetic fibre additives of recorn @ 125gms per bag cement mixed with WPC @2% by weight of cement. Note :- WPC and synthetic fibre additives of recron shall be meaasured and paid seperately.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for rendering 10mm thick on fair faces of ceilings in CM (1:3) & rendering is to be finishing even & smooth without using extra cement complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for preparation of new plastered surface of wall and applying 2 coats of oil emuslion distemper over a coat of 1 to 2 mm thick wall care putty complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for preparation of new plastered surface of ceiling and applying three coats of white wash, complete all as specified and directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material & labour for complete removal of existing plastered wall surfaces, preparation of surfaces, filling cracks with approved crack filler & applying two coats of water proof paint (Rain coat of Dr. fixit or equivalent in STP, Fosroc, Krishna as approved) over a coat of Dr. Fixit primeseal or equivalent in STP, Fosroc, Krishna as approved wall primer complete all as specified and as per manufacturer's instruction.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Material and labour for preparation of old plastered surface of wall and applying 2 coats of oil emuslion distemper over a coat of 1 to 2 mm thick wall care putty complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fix for MS framed works as in grills, railings, brackets for chajjas etc, conforming to FE-290 Gde E-165 complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing for Pre-painted Galvalume Aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Taking down soil, rain water pipes (any size or pattern), including all fittings, heads,shoes,bends, swan-neck, etc. Including cleaning or refixing or removal to store ( measured over all as fixed along the center line over fittings and accessories) complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing 110 mm dia PVC (SWR) grade pipes, single socketed in any length with rubber ring joints fixed to walls / laid in trenches with and including fixing clips complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing in repairs110 mm dia PVC (SWR) grade single T/Y, etc, with access doors including fixing clips complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing in repairs 110 mm dia bore PVC (SWR) bends any radius complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing for 160mm dia PVC (SWR) grade pipes, single socketed in any length with rubber ring joints fixed to walls with and including fixing clips complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing in repairs 160mm dia PVC (SWR) bends any radius, complete all as specified and as directed.
Supply and fixing for 100 mm bore of sand cast CI soil waste pipe in any length with ears and jointed with neat cement paste fixed to wall complete all as specified.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing for 75mm bore of sand cast CI soil waste pipe in any length with ears and jointed with neat cement paste fixed to wall complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing as in repairs 75mm sand cast CI Branch pieces (Tee), Single (equal), ordinary or inverted (spigot or socket type) or with parallel branches with ovel access door and jointed with neat cement paste to CI pipes fixed to wall or roof at any floor/ any height/ any location including all fittings complete all as specified and as directed by Engr-in-Charge.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing as in repairs 100mm sand cast CI Branch pieces (Tee), Single (equal), ordinary or inverted (spigot or socket type) or with parallel branches with ovel access door and jointed with neat cement paste to CI pipes fixed to wall complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing in repair stack clamps suitable for securing 100mm dia CI pipe made out of 50mm by 5mm flat iron and 16mm dia round iron stays Including bolts and nuts and securing ends of stays fixed to wall, complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing stack clamps suitable for securing 75mm dia CI pipe made out of 50mm by 5mm flat iron and 16mm dia round iron stays Including bolts and nuts and securing ends of stays fixed to wall, complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Taking up or down 15mm bore steel tubing and connections, including cleaning for refixing, complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Taking up or down 20mm bore steel tubing and connections, including cleaning for refixing, complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing 15mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors, complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing 20mm bore steel water tubes, medium grade, galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors complete all as specified and as directed.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor
Supply and fixing Gun-metal, globe or gate valves 50mm bore dia., with iron wheel head, screwed both ends for iron pipe and fixed above 5th floor terrace complete all as specified and as directed.
Demolition of Cement concrete in any description and in any position not other wise specifically provided on terrace of bldg. as directed by Engineer-in-Charge and removal of debris to out side MoD land complete all as specified and as directed.
Material and labour for Plain cement concrete 1:2:4 type B-0 (using 12.5mm graded stone aggregate) mixed with Shali Plast LW+ of STP/Pidilite URP of Dr. Fixit or Equivalent and appoved as per manufactures instruction. Before laying concrete surface shall be cleaned and a bond coat of slurry with Shali Crete URP (of STP) or quivalent with cement to be applied. Alll cracks in slab to be openend in 'V' groove and filled with Shali Fix RMC a Polymer Morter of STP/ equivalent complete all as specified and as directed.
Material and labour for 10mm thick rendering in CM 1:4 with the addition of Shaliplast LW+ @ 200ml per bag of cement on fair faces of brick or concrete surfaces all as directed by Engr-In-Charge.
Material and labour for protecting the roof including parapet wall with water proofing coating ,complete as specified below: (a) Clean the surface and apply one coat of primer (STP Shali Urethane BTD diluted in water in 1:1 ratio and applied @ 400 gm/sqm OR Dr, Fixit primeseal diluted in water in 2:1 ratio and applied @ 7-8 sqm/ltr) and allows to dry for 6 to 8 hrs. (b) Apply first coat of water proofing coating over primer surface (Shali Urethene BTD with non butuminous bleding of STP Ltd. @ 1 Sqm/Ltr without dilution OR Dr. Fixit New Coat without any dilution @ 2 Sqm /Ltr) (c) Lay Non woven fiber glass mesh (Reinforcement of Shali Geo Text 40/50 gsm of size 2.5mm x 2.5mm) or equivalent with overlap of 50 mm on both direction while the first coat is still wet. (d) Apply second coat of water proofing coating as per manufactures instruction after 6-8 hrs of drying of first coat. (e) Apply third coat of water proofing coating (as per manucturer instruction) after 6-8 hrs of drying of second coat The total thickness of 1 to 1.2mm must be achieved after 7 days of air cure. Note : 1) The colour of each coat shall be as directed by GE. 2) The work shall be carried out by aithorised applicator only 3) Water proofing to rain water spouts to be done as per manufacturer instruction
Material and labour for cement concrete (1:2:4) type B-0 (12.5mm graded stone aggregate) as in roof kerbs and leveling course on RCC roof surfaces complete all as specified and as directed.
Removal of tree roots and branches spreed over stone wall/brick wall joints, injecting anti vegetation chemical and making good the stone/ brick wall joints by flush pointing in CM (1:4) including provision of necessary scafolding and removing the debris outside MoD land.
From GL to, upto and including 4th floor
From 5th floor to, upto and including 8th floor
From 9th floor to, upto and including 12th floor
From 13th floor to, upto and including 16th floor Note for all items :- The work in bldgs is to be carried out in high storeyed buildings. The rates quoted shall be inclusive of necessary scaffolding and safety measures of labours engaged in the work as per latest labour laws & regulations.
RAJU AND CO
SN CONSTRUCTION
SHREE JAGDISH FURNITURE CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .