Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
8 Jul 2026, 6:00 pm
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer, PWD Circle, Tonk
Superintending Engineer, PWD Circle, Tonk
Construction of BT Road from Nayagaon to Rajkot
2026_CEPWD_568886_3
NIT 02/2026-27 PWD CIRCLE, TONK
Open Tender
Civil Works
120 days
Tonk
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Through online EGras Challan Office ID 23028
₹3.7 L
Yes
18 Jun 2026
18 Jun 2026
9 Jul 2026
18 Jun 2026
8 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART 'A' : ROAD WORK | |||||
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 1.6 | P.Hect. | 10,374 | ₹16,598.4 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 11,812.5 | P.Cum | 44 | ₹5,19,750 |
| 4 | Carriage of Earth, Sand, Lime, Morrum manure or sludge with in lead of 15 Km | 1,312.5 | P.Cum | 94.3 | ₹1,23,768.75 |
| 5 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means with a lead of 1 Km. For Grading-I Material | 1,238.94 | P.Cum | 773 | ₹9,57,700.62 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 1,125 | P.Cum | 407 | ₹4,57,875 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. | 1,134.56 | P.Cum | 1,044 | ₹11,84,483.25 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 7,725 | P.Sqm | 28 | ₹2,16,300 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 7,725 | P.Sqm | 10 | ₹77,250 |
| 10 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing of aggregate and plastic waste cutting in a hotmix plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510. (Bitumen VG-30) (By mechnical means) Waste Plastic @ 8% of bitumen. Case - II By Mechanical Means Bitumen (VG-30) | 7,725 | P.Sqm | 124 | ₹9,57,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.72 MB
Tendernotice_2.pdf
PDF • 1.45 MB
Tendernotice_3.pdf
PDF • 14.98 MB
BOQ_1012444.xls
BOQ • 0.40 MB
Tender_docs_nayagaon.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid