Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC ANANTNAG JAMMU AND KASHMIR | ₹2.2 L | L1 | Accepted-AOC Successful |
| 2 | L2₹2.5 L+₹23,792.02 (10.6%)Rejected-AOC | ₹2.5 L+₹23,792.02 (10.6%) | L2 | Rejected-AOC Unsuccessful |
| 3 | L3₹2.7 L+₹45,827.59 (20.5%)Rejected-AOC | ₹2.7 L+₹45,827.59 (20.5%) | L3 | Rejected-AOC Unsuccessful |
| 4 | L4₹2.9 L+₹63,871.21 (28.6%)Rejected-AOC ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | ₹2.9 L+₹63,871.21 (28.6%) | L4 | Rejected-AOC Unsuccessful |
| 5 | L5₹3.0 L+₹78,146.43 (35.0%)Rejected-AOC | ₹3.0 L+₹78,146.43 (35.0%) | L5 | Rejected-AOC Unsuccessful |
Tender Value
Refer Docs
EMD Value
₹6,380
Closing Date
17 Aug 2026, 6:00 pmClosed
DFO, Social Forestry Division Anatnag
Social Forestry Division Anantnag
Providing and fixing of Iron Tree Guards 105 Nos and plantation work at Avenue Strip Aharbal
2026_FD_318353_8
eNIT No. 01 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Avenue Strip Aharbal
Providing and fixing of Iron Tree Guards 105 Nos and plantation work at Avenue Strip Aharbal
2 documents required · 2 mandatory
₹250
Polling Account 0110010200001103
₹6,380
21 Sept 2026
28 Jul 2026
19 Aug 2026
28 Jul 2026
17 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed, in all kinds of soil. JKSSR 2022. =4x0.15x0.15x0.40x0.036 = 0.04 cum for 01 tree guard i.e. for 105 Tree guards 0.04x105 = 4.20 Cum | 4.2 | Cum | 479.3 | ₹2,013.06 |
| 2 | Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. JKSSR 2022. 25x25x3mm vertical angle 4x1.60 = 6.40
Horizontal angle 8x0.45 = 3.60
Total = 9.40 cum 1.10 kg/rm 10.34 10.34 Kgs MS Flat 25x3mm 8x1.20 = 9.60 @ 0.6 kg/rm 5.76 kgs 5.76Kgs
Horizontal 25x5mm 4x0.45x = 1.80 @ 1.0 kg/rm 1.80 1.80 Kgs For 1 Tree Guards 17.90 Kgs M S Plate 450x150x1mm 1x2x0.45x0.15 = 0.135 sqm 0.135x0.001x7850 = 1.059 kg 1.059 Kgs For 1 Tree Guards G total 18.959 Kgs i.e. 105x18.96 = 1990.80 Kgs | 1,990.8 | Kg's | 1 | ₹1,988.81 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats incl a coat of steel priemer. JKSSR 2022 4x0.45x1.20x2.16 For 1 Tree Guards 1 x 2.16 = 2.16, 2.16x0.30x 0.65 sqm i.e. 0.65x105 = 68.25 Sqm | 68.25 | Sqm | 131.85 | ₹8,998.76 |
| 4 | Lettering /writing Aplha Numerical on M.S Plate 250x100 mm of required dimensions. | 2 | Kg's | 50 | ₹100 |
| 5 | Planting of Ornamental poly bag Plants in pit size ( 45x45x45 ) Cms. | 105 | Kg's | 29.34 | ₹3,080.7 |
| 6 | cost/carriage of ornamental plants ( height 3feet or above) | 105 | Kg's | 187 | ₹19,635 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1048416.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .