| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 LAccepted-AOC 1 262 BAISHNABGHATA PATULI TOWNSHIP M BLOCK M 262 B P TOWNSHIP MAIL SATHBIGHA PURBA PUTIARY KOLKATA 700093 | 24 PARAGANAS SOUTH | WEST BENGAL | 700093 | ₹5.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.1 L+₹10,660.58 (2.14%)Rejected-Finance 102 1 PURBA FULL BAGAN KOL 700086 | KOLKATA | WEST BENGAL | 700086 | ₹5.1 L+₹10,660.58 (2.14%) | 2 | Rejected-Finance 2 |
| 3 | 3₹5.2 L+₹17,634.79 (3.54%)Rejected-Finance 68 SREERAMPUR GARIA KOLKATA 700084 | KOLKATA | KOLKATA | WEST BENGAL | 700084 | ₹5.2 L+₹17,634.79 (3.54%) | 3 | Rejected-Finance 3 |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
19 Feb 2026, 11:00 amClosed
Executive engineer (Uttaran Services)
1, Hogg. Street, Hogg Building, 3rd Floor, Kolkata - 700087
REPAIRING OF SANITARY LATRINES AT SATINDRA PALLY ADIBASHI PARA UPOR AND NICHER BASHA ETC UTTARAN IN WARD NO- 111,BR-XI
2026_KMC_1003455_1
KMC/US/HQ/111/25-26/260
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-111
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
24 Aug 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 443.84 | SQUARE METER | 19 | ₹8,432.87 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 2.81 | CUBIC METER | 939 | ₹2,633.9 |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 4.3 | CUBIC METER | 447 | ₹1,922.1 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 11.4 | SQUARE METER | 724 | ₹8,253.6 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | 1 | CUBIC METER | 5,798 | ₹5,798 |
| 6 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 1.32 | CUBIC METER | 6,047 | ₹7,982.04 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?36...Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.Notes:- For shuttering in shell roof, grid roof with vertical faces folded plate, arched roof the rate in 36 (a), 36 (b) & 37 (c ) of subhead B above to be increased by 100 % . For grid roof with splayed faces, rate is to be increased by 150%. | 17.57 | SQUARE METER | 335 | ₹5,885.95 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. | 0.01 | MATRIC TON | 57,301.38 | ₹593.76 |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 234 | SQUARE METER | 186 | ₹43,524 |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 157.86 | SQUARE METER | 161 | ₹25,415.46 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
TF.pdf
Tender Documents • 1.18 MB
BOQ_2459739.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .