Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹70.1 L
EMD Value
₹71,000
Closing Date
3 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director,
DRDA, Pudukkottai
Deepening and Improvements to the Ooranies_5 nos. in AGAMT-II-2021-22 Village panchayats of Aranthangi Block in Pudukkottai District in Package no.7
2022_RDTN_243570_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹71,000
23 Aug 2022
23 Jul 2022
3 Aug 2022
23 Jul 2022
3 Aug 2022
23 Jul 2022
Amount
1. Deepening of Vazhapillaiyar oorani Retaining wall-22m, Bathing ghat , Outlet & Baby pond with Lining wall @ Arasarkulam Keelpathi in Arasarkulam Keelpathi panchayat.
(i) Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
(ii) Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iii) Bathing ghat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iv) Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(v) Outlet
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
2. Deepening of Annuvarthi Pillaiyarkoil oorani Retaining wall(19m) , Baby pond with Lining wall @ Avanathankottai in Avanathankottai panchayat.
(i) Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
(ii) Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iii) Bathing ghat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iv) Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
3. Deepening of Kundukulam Retaining wall-14m, Bathing ghat , Outlet & Baby pond with Lining wall @ Kurumbur in Kurumbur panchayat.
(i) Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
(ii) Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iii) Bathing ghat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iv) Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(v) Outlet
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Deepening of Sivagangai oorani Retaining wall-24m, Bathing ghat & Baby pond with Lining wall @ Kattaiyan kudieruppu in Thirunalur panchayat.
(i) Oorani
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
(ii) Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iii) Bathing ghat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
(iv) Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soills such as hard gravelly soiletc., as per SS20B for narrow foundation ect., complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Cenrting for sides and soffits including cost and conveyance of all materials and labour charges etc complete
Cement concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
5. Deepening of Neduvettu Oorani ,Bathing ghat ,Inlet,Retaining wall (8m) & Baby pond with Lining wall at Kammakadu in Kammakadu panchayat.
Clearing light jungles and clearing away carefully and burning it including all labour charges etc..m
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Bathing Ghat & Baby Pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
P.C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
PROVIDING FORM WORK CENTERING FOR SOFFITS of slab of plan surface inculding shuttering 3m high using of size 15 x 25 x 3 mm laid over w.joins of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
INLET
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
P.C.C. 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
PROVIDING FORM WORK CENTERING FOR SOFFITS of slab of plan surface inculding shuttering 3m high using of size 15 x 25 x 3 mm laid over w.joins of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
Supply and Delivery of RCC Hume pipe of 1.10x1.10x m including cost and conveyance of all materials to work site and all labour charges etc.complete
RETAINING WALL
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Filling with good river sand including cost and conveyance and all labour charges etc completed.
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PALANISAMY R
Bidder Name
OSM CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .