| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC NULL | ₹3.6 L Quoted ₹35.6 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹35.6 L+₹0.10 (<0.01%)Rejected-Finance 12 SARAT SMITTY BHAWAN HENGRABARI KALIMANDIR HENGRABARI KAMRUP ASSAM 781036 | KAMRUP METRO | ASSAM | 781036 | ₹35.6 L+₹0.10 (<0.01%) | L2 | Rejected-Finance Not admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
Tender Value
₹39.6 L
EMD Value
₹79,215
Closing Date
18 Oct 2024, 1:00 pmClosed
Chief Engineer Minor Irrigation Assam
O_O the Chief Engineer Irrigation Assam Chandmari Guwahati_03
Canal Extension of Maloibari ELIS Bharguliu PC under RIDF-XXX NABARD for the year 2024-25under Dispur Division Package_41
2024_ID_39149_41
01_RIDF_XXX_2024_25 Date_21_09_2024
Open Tender
Civil Works
Item Rate
180 days
kariganj south
Please refer Tender documents.
4 documents required · 4 mandatory
₹900
₹79,215
Yes
O_O the Chief Engineer Irrigation Assam Chandmari
20 Jan 2025
25 Sept 2024
19 Oct 2024
25 Sept 2024
18 Oct 2024
27 Sept 2024
5 Oct 2024
Amount
Extension of 160.00 m of Main Canal 2 from Ch. 240.00 m of Main Canal 2
Item no. 1: Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed. Canal
Item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (ii) in proportion 1:3
Item no. 5: River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Item no. 6: CC work in proportion 1:1½:3 with hard broken river stone aggregate from river boulder of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 7: 12 mm cement plastering including clearing surface and curing, complete as directed. (i) In proportion 1:3
Item no. 8: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Column
Item no. 9: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item no. 10: RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 11: Neat cement finishing 3 mm thick with cement slurry prepared by mixing 27.50 Kg of fresh cement in appropriate quantity of clean water to cover 10 (ten) SqM of work area and to give a smooth and hard finishing including rounding corners, brooming, curing etc, complete as directed.
Item no. 12: Earthwork in filling in canal embankment, approach road, afflux bund, guide bund etc. to the designed section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia. and uprooting roots and stumps from the seat of embankment and borrow pits area, including breaking clods to not more then 10 mm cube ramming, dressing, watering and roughening the seat of embankment, profiling etc. paying compensation of earth borrowed from private land if any, lead upto 30 M and lift upto 1.5 M complete as directed. (By head lead in sandy, clayey or loamy soil).
Extension of 26.00 m of Branch Canal 3 from Ch. 320.00 m of Main Canal 2
Item no. 1: Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed. Canal
Item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (ii) in proportion 1:3
Item no. 5: River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Item no. 6: CC work in proportion 1:1½:3 with hard broken river stone aggregate from river boulder of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 7: 12 mm cement plastering including clearing surface and curing, complete as directed. (i) In proportion 1:3
Item no. 8: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Column
Item no. 9: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item no. 10: RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 11: Neat cement finishing 3 mm thick with cement slurry prepared by mixing 27.50 Kg of fresh cement in appropriate quantity of clean water to cover 10 (ten) SqM of work area and to give a smooth and hard finishing including rounding corners, brooming, curing etc, complete as directed.
Item no. 12: Earthwork in filling in canal embankment, approach road, afflux bund, guide bund etc. to the designed section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia. and uprooting roots and stumps from the seat of embankment and borrow pits area, including breaking clods to not more then 10 mm cube ramming, dressing, watering and roughening the seat of embankment, profiling etc. paying compensation of earth borrowed from private land if any, lead upto 30 M and lift upto 1.5 M complete as directed. (By head lead in sandy, clayey or loamy soil).
Construction of a Tractor Crossing at New Canal
Item no. 1: Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed.
Item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Item no. 5: 12 mm cement plastering including clearing surface and curing, complete as directed. (i) In proportion 1:3
Item no. 6: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item no. 7: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item no. 8: RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 9: Neat cement finishing 3 mm thick with cement slurry prepared by mixing 27.50 Kg of fresh cement in appropriate quantity of clean water to cover 10 (ten) SqM of work area and to give a smooth and hard finishing including rounding corners, brooming, curing etc, complete as directed.
Item no. 10: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M)
Construction of a Cross Drainage at New Canal
Item no. 1: Earthwork in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks as necessary including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto 1.50 M, complete as directed.
Item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: 12 mm cement plastering including clearing surface and curing, complete as directed. (i) In proportion 1:3
Item no. 5: Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Item no. 6: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item no. 7: RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 8: CC work in proportion 1:1½:3 with hard broken river stone aggregate from river boulder of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 9: Neat cement finishing 3 mm thick with cement slurry prepared by mixing 27.50 Kg of fresh cement in appropriate quantity of clean water to cover 10 (ten) SqM of work area and to give a smooth and hard finishing including rounding corners, brooming, curing etc, complete as directed.
DAL THOMS SCIENTIFIC (BID ID -245048)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .