| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC 2313 SF 262 7 PETROL BUNK BACKSIDE P N ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.9 LRejected-AOC | ₹9.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ganesan L1 | K SEKAR L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF RETAINING WALL ALONG THE ROAD SIDE FROM MAYAANAM TOWARDS MELVENKATAPURAM AT KESAVANANKUPPAM VILLAGE H/O KESAVANANKUPPAM PANCHAYAT SHOLINGHUR BLOCK RANIPET DISTRICT | |||||
| 2.00 | Earthwork excavation for foundation in all soilsand sub soils to full depth etc.,ordinary soil complete. | 137.7 | Cum | 263.7 ₹36,311.49 | 263.78 ₹36,322.51 |
| 3.00 | Cement concrete 1:4:8 (one cement ,fourM.sand and eight hard broken stone jelly) using 40mm gauge hard broken granite stone jellyfor foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standard spceification | 15.3 | Cum | 5,486.3 ₹83,940.39 | 5,486.35 ₹83,941.16 |
| 4.00 | Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid) | 367.2 | Sqm | 543.5 ₹2.0 L | 546.5 ₹2.0 L |
| 5.00 | Plain cement concrete 1: 3:6 (one cement ,two M.sand and four hard broken stone jelly) using 20 mm jelly for wearing coat including laying, compacting ,finishing and curing,etc.,complete as per standard specification and as directed by the departmental officers. | 82.62 | Cum | 6,243.7 ₹5.2 L | 6,243.76 ₹5.2 L |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,50,422.32 ₹1.5 L | 1,50,623.63 ₹1.5 L |
Tender Value
₹10.0 L
EMD Value
₹19,980
Closing Date
17 Feb 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
CONSTRUCTION OF RETAINING WALL ALONG THE ROAD SIDE FROM MAYAANAM TOWARDS MELVENKATAPURAM AT KESAVANANKUPPAM VILLAGE H/O KESAVANANKUPPAM PANCHAYAT SHOLINGHUR BLOCK RANIPET DISTRICT.
2026_RDTN_658665_1
A3/1733/2025
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹19,980
Yes
6 Mar 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
CONSTRUCTION OF RETAINING WALL ALONG THE ROAD SIDE FROM MAYAANAM TOWARDS MELVENKATAPURAM AT KESAVANANKUPPAM VILLAGE H/O KESAVANANKUPPAM PANCHAYAT SHOLINGHUR BLOCK RANIPET DISTRICT
Earthwork excavation for foundation in all soilsand sub soils to full depth etc.,ordinary soil complete.
Cement concrete 1:4:8 (one cement ,fourM.sand and eight hard broken stone jelly) using 40mm gauge hard broken granite stone jellyfor foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick,well rammed,consolidated and curing etc.complete complying with standard spceification
Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid)
Plain cement concrete 1: 3:6 (one cement ,two M.sand and four hard broken stone jelly) using 20 mm jelly for wearing coat including laying, compacting ,finishing and curing,etc.,complete as per standard specification and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_790185.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid