| 1 | L-1₹59,590Accepted-AOC 0 GOPAL GANJ CHABUTRA KE SAMNE PRATAPGARH PRATAPGARH PRATAPGARH RAJASTHAN 312605 UDYAM RJ 27 0002563 | PRATAPGARH | RAJASTHAN | 312605 | ₹59,590 Quoted ₹50,500 | L-1 | Accepted-AOC Accepted as the bidder attains L-1 status |
| 2 | L-2₹51,050Rejected-Finance 42 11 DIPKA PALI ROAD DIPKA DIPKA KORBA CHHATTISGARH 495452 UDYAM CG 10 0007210 | KORBA | CHHATTISGARH | 495452 | ₹51,050 | L-2 | Rejected-Finance Rejected as the bidder attains L-2 status |
| Sl No | Description | Qty | Unit | V R ENTERPRISES L1 | SHASHI BHUSHAN SINGH L2 |
|---|---|---|---|---|---|
| 1.00 | Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required. | 4 | No. | 3,900 ₹15,600 | 2,950 ₹11,800 |
| 2.00 | Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm) | 30 | Mtr | 110 ₹3,300 | 85 ₹2,550 |
| 3.00 | Fabrication of MS Channel/Angle/Flat for making entry gate of the substation and fixing of barbed wire as per requirement. | 200 | Kg | 8 ₹1,600 | 7 ₹1,400 |
| 4.00 | Erection of 4.5 mtr. long steel tubular poles including excavation of pole pit as per site conditions and grouting by cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) etc (0.21 cum each pole) | 10 | No. | 1,500 ₹15,000 | 1,850 ₹18,500 |
| 5.00 | Providing & fixing of Galvanised iron barbed wire for fencing of the substation (Laying of GI barbed wire in 4 to 5 two including some crossing etc.) | 600 | Mtr | 25 ₹15,000 | 28 ₹16,800 |
| 6.00Note: The estimated cost put to tender is excluding the PF and Pension Component. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 05 nos. | |||||
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Updated dates
Tender Value
₹93,064
EMD Value
₹1,200
Closing Date
6 Mar 2026, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Improvement of earthing system and fencing of two nos. outdoor type substation, 3.3KV/433V installed at Railway W/B and Beltikri rehab site under Dipka Area.
2026_SECL_353439_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/127 dtd-17/02/26
Open Tender
Electrical and Maintenance Works
10 days
Dipka Area
Please refer to tender documents
5 documents required · 5 mandatory
₹1,200
18 Apr 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
6 Mar 2026
19 Feb 2026
18 Feb 2026 - 25 Feb 2026
Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/ coke and salt as required.
Supplying and laying 25 mm X 5 mm G.I strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with G.I. nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of G.I. nut bolt & spring washer spaced at 50mm)
Fabrication of MS Channel/Angle/Flat for making entry gate of the substation and fixing of barbed wire as per requirement.
Erection of 4.5 mtr. long steel tubular poles including excavation of pole pit as per site conditions and grouting by cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) etc (0.21 cum each pole)
Providing & fixing of Galvanised iron barbed wire for fencing of the substation (Laying of GI barbed wire in 4 to 5 two including some crossing etc.)
Note: The estimated cost put to tender is excluding the PF and Pension Component. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 05 nos.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_366257.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 1.38 MB
Tendernotice_3.pdf
PDF • 0.15 MB
BOQ_366257.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid