Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance H NO 384 SHIVALIK PURAM JANIPUR COLONY JAMMU | Admitted-Finance |
Tender Value
₹25.4 L
EMD Value
₹50,800
Closing Date
20 Jan 2020, 6:00 pmClosed
ER. MUJIB AHMED TAK
O/o DEPUTY DIRECTOR TOURISM M AND W JAMMU
Construction of Compound Wall for proposed Archives building at Rajinder Vihar, Phase-II Bantalab Jammu
2020_Tourm_89954_1
e-NIT No. 88 of 2019-20 Dated 06-01-2020
Open Tender
Civil Works
Item Rate
60 days
BANTALAB
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DEPUTY DIRECTOR TOURISM M AND W JAMMU
₹50,800
24 Jan 2020
8 Jan 2020
21 Jan 2020
8 Jan 2020
20 Jan 2020
8 Jan 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size) Crushed including cost and carriage of materials by mechnical transport
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Nallah including cost and carriage of materials by mechnical transport
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttermg including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and centilevers.
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand:4 graded stone aggregate 20mm nominal size including cost/carriage of material by mechanical transport.
Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 sand) in foundation and plinth and brick work in superstructure above plinth level upto floor V level. (By manual means) including cost/carriage of material by mechanical transport.
Reinforced cement concrete work in beams,suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate
Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars including cost/carriage of material by mechanical transport.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) including cost/carriage of material by mechanical transport
Supplying at site Angle iron posts & struts of required size including bottom to be split and bent at'rightangle' in opposite direction for 10 em length and drilling holes upto 10 mm dia etc. including cost/carriage of material by mechanical transport complete.
Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacture, over the plastered wall surface to prepare the surface even and smooth including cement primer etc complete.
Supply and fixing of Galvanized Iron Barbed Wire of superior quality 9.38 Kg Per 100 Metres (min) on erected angles fitted and fixed with GI Staples complete as per the instructions of Engineer In-charge including cost/carriage of material by mechanical transport complete
Finishing wall with premium weather sheild smooth exterior paint with silicone additives of required shade on New work (two or more coats applied @ 1.43 litre/10 sqm over and including base Coat of water proofing cement paint app-lied @ 2.20kg/10 sqm) including cost/carriage of material by mechanical transport complete.
Amit Katyal
PAWAN KUMAR
RGS INFRASTRUCTURE DEVELOPERS
Uttam Singh
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .