Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC Due to L1 Bidder |
| 2 | L2₹6.9 L+₹1.4 L (25.2%)Rejected-Finance | ₹6.9 L+₹1.4 L (25.2%) | L2 | Rejected-Finance Due to L2 Bidder |
| 3 | L2₹6.9 L+₹1.4 L (25.2%)Rejected-Finance | ₹6.9 L+₹1.4 L (25.2%) | L2 | Rejected-Finance Due to L2 Bidder |
| 4 | L2₹6.9 L+₹1.4 L (25.2%)Rejected-Finance AT MAIN ROAD AMBAPUA GAYATRI NAGAR PO BERHAMPUR PS GOPALPUR | BERHAMPUR | GANJAM | ODISHA | ₹6.9 L+₹1.4 L (25.2%) | L2 | Rejected-Finance Due to L2 Bidder |
| 5 | L2₹6.9 L+₹1.4 L (25.2%)Rejected-Finance AT PO MUNDAMORAI PS DHARAKOTE DIST GANJAM PIN 761114 | GANJAM | ODISHA | 761114 | ₹6.9 L+₹1.4 L (25.2%) | L2 | Rejected-Finance Due to L2 Bidder |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
22 May 2026, 5:30 pmClosed
SE,HARABHANGI IRRI DIVN
O/O SE,HARABHANGI IRRI DIVN
MAINTENANCE WORK
2026_CEBMB_128949_33
SE-HID-ADV-02/2026-27
National Competitive Bid
Civil Works - Others
Percentage
90 days
ADAVA
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹7,000
Yes
24 Jul 2026
11 May 2026
25 May 2026
11 May 2026
22 May 2026
11 May 2026
11 May 2026 - 13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard soil or gravelly soil with all leads, lifts, delifts including dressing and leveling the bed to design section and depositing excavated materials away from working area in spoil banks with all leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required, bailing out water with all cost, conveyance, labour and cess and all other taxes, cess etc. complete as per the approved drawing, design, specification and direction of the Engineer-in-Charge. | 1 | Cum | 276.9 | ₹276.62 |
| 2 | Filling foundation and plinth with sand with well watered and rammed including all cost, conveyance, royalty, cess and taxes of materials, excluding GST, but including labour charges etc .Complete with all leads, lifts, delifts etc as per specification and direction of the Engineer in charge. | - | Cum | 792.5 | - |
| 3 | Providing and placing in position of Cement Concrete of design mix of M-15 A-40 grade with 40mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying with all labour, materials, T&P, royalty, taxes and CESS etc. complete as per specification and direction of the Engineer-in-Charge | - | Cum | 4,992.1 | - |
| 4 | Providing and placing in position of Cement Concrete of design mix of M 15 A-20 grade having specified characteristic compressive strength of 15 N/mm2 in design mix with the quantity of cement as specified in I.S. / I.R.C,. code of 150 mm cube at 28 days curing after mixing & tests conducted in accordance with relevant clauses of I.S. – 516 / I.R.C. –78 using crusher broken hard granite coarse aggregate 20 mm downgraded and proportion as specified in I.S. 456 / I.R.C. 21 code and subject to mix design in conformity to the grading and proportion of different materials of concrete in canal structures as specified in the relevant codes of approved quantity obtained from approved quarry and using the minimum quantity of cement in accordance with the test result of design mix as per relevant clause of IS code and approved quality of aggregates free from weathered skin surface and any other deleterious materials , uniform coloured texture with all leads, lifts and delifts including cost, carriage, royalties, cess, taxes and quality control test cost of all materials, dewatering, mixing and vibrating for compaction by mechanical means and providing grooves or beads wherever necessary including cost, carriage of water, curing , T&P labour and supervision charges including mobilization and demobilization including hire and running charges of all machineries etc with cost of construction and maintenance of coffer dam and diversion arrangement and removal required in complete as per approved design, drawing , specification and direction of the Engineer in charge. | 1 | Cum | 5,523.6 | ₹5,518.08 |
| 5 | Providing form work of concrete in irrigation structure with F1 finish of upstream faces of dam, spillway, galcis of barrages, unexposed surface of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surface where necessary complete with all labour, materials and T&P complete as directed by the Engineer-in-charge. | - | Sqm | 663.6 | - |
| 6 | Labour for laying and fixing in position of 100mm dia RCC spun pipe NP3 with collar jointed with Cement Mortar (1:3) including cost, conveyance ,royality of all materials and curing including supply of hume pipes with cost, carriage and all other taxes of the materials to the site of work etc. Complete including curing as per direction of the Engineer-in-Charge. | - | Rmt | 422.5 | - |
| 7 | Filling foundation and plinth with sand with well watered and rammed including all cost, conveyance, royalty, cess and taxes of materials, excluding GST, but including labour charges etc .Complete with all leads, lifts, delifts etc as per specification and direction of the Engineer in charge. | 1 | Cum | 153.8 | ₹153.65 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_590254.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_590254.xls
BOQ • 0.33 MB
TECHNICAL37.pdf
Tender Documents • 1.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .