Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15,100
Closing Date
8 Jul 2026, 2:00 pm7d left
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Perumbakkam 110KV SS
2026_EB_682676_1
OT-05/2026-27 of SE/GCC-II
Open Tender
Civil Works
120 days
Perumbakkam
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹15,100
Yes
24 Jun 2026
24 Jun 2026
9 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of T Clamp connector for Moose to Moose conductor, as per IS specifications and standards | 12 | Nos | - | - |
| 2 | Labour charges for paying out of 3 Nos. Twin moose conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including sorting out of conductor according to drum schedule and loading and unloading at site, cost of T&P lead and lift etc., complete. Under Non LC Condition | 0.03 | Km | - | - |
| 3 | Labour charges for rough sagging, tensioning, clipping, jumpeing for 3 nos. twin moose conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including providing trussels cost of T&P lead and lift etc., complete. | 1 | Span | - | - |
| 4 | Labour charges for removing of loop jumpering and re strining of loop jumpering including cost of loading and unloading, transporting, etc complete | 2 | Span | - | - |
| 5 | Labour charges for 400 KV side gantry dropper using Twin Moose conductor work including cost of loading and unloading, transporting, etc complete(Under LC Condition) | 3 | Nos. | - | - |
| 6 | cleaning juliflora jungle with uprooting | 50 | Sqm | - | - |
| 7 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. | 48 | cum | - | - |
| 8 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 8 | cum | - | - |
| 9 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 15.5 | cum | - | - |
| 10 | Providing RCC 1:1.5:3 using 20 mm HBG metal for foundation without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 11.5 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_820628.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid