Loading…
Loading…
Tender Value
₹2.0 L
Closing Date
20 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER CWC BURLA
RENOVATION OF CHILDREN PARK AT RESIDENTIAL COMPLEX UNDER MAHANADI DIVISION CWC BURLA
2026_CWC_848126_1
MD/HQ/NIQ/2026-27/208-09 DATED-13/08/2026
Open Tender
Civil Works
Item Rate
90 days
MAHANADI DIVISION CWC BURLA
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
Exempted
13 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of Soil. | 226.42 | Sqm | - | - |
| 2 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). | 0.4 | Cum | - | - |
| 3 | Supplying and stacking of good earth at site including royalty and carriage upto 5 k m leadcomplete (earth measured in stacks will be reduced by 20% for payment). | 1 | Cum | - | - |
| 4 | Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment) | 1 | Cum | - | - |
| 5 | Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) | 1 | Cum | - | - |
| 6 | Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of officer-in-charge. | 226.42 | Sqm | - | - |
| 7 | Demolishing brickwork manuly/ by mechanicaly means including slaking of seviviciable material and disposal of unservicable material within 50m lead as per direction of engineers in charge | 1.93 | Cum | - | - |
| 8 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) : with F.P.S. (non modular) bricks | 1.93 | Cum | - | - |
| 9 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the wallscomplete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1 cement : 4 fine sand) | 1 | Sqm | - | - |
| 10 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. Complete. | 141.82 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
TENDER DOCUMENT.pdf
Tender Documents • 1.31 MB
BOQ_1153516.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .