| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.1 LAccepted-AOC | ₹68.1 L Quoted ₹74.5 L | L1 | Accepted-AOC Lower Rates |
| 2 | L2₹76.6 L+₹2.1 L (2.87%)Rejected-Finance PUNJAB INDIA | FATEHGARH SAHIB | PUNJAB | 140402 | ₹76.6 L+₹2.1 L (2.87%) | L2 | Rejected-Finance Due to higher Rates |
| Sl No | Description | Qty | Unit | JATTANA CONSTRUCTION CO L2 | PKG ENGINEERING AND INFRASTRUCTURES L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. | 23,409.75 | cum | 110 ₹25,75,072.5 | 105 ₹24,58,023.75 Lowest |
| 2.00 | Lowering, jointing of RCC NP-2 plain end pipes 600 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect. | 6,583.83 | Mtr | 400 ₹26,33,532 | 390 ₹25,67,693.7 Lowest |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 356.33 | cum | 195 ₹69,484.35 | 191 ₹68,059.03 Lowest |
| 4.00 | cement concrete 1:4:8 | 39.62 | cum | 4,600 ₹1,82,252 | 4,500 ₹1,78,290 Lowest |
| 5.00 | Cement concrete 1:2:4 | 62.42 | cum | 5,500 ₹3,43,310 | 5,400 ₹3,37,068 Lowest |
| 6.00 | Shuttering for concrete faces | 389.19 | sqm | 221 ₹86,010.99 Lowest | 221 ₹86,010.99 Lowest |
| 7.00 | First class burnt brick work laid in cement sand mortar 1:6 | 182.8 | cum | 6,400 ₹11,69,920 | 6,350 ₹11,60,780 Lowest |
| 8.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 444.78 | sqm | 175 ₹77,836.5 | 173 ₹76,946.94 Lowest |
| 9.00 | RCC slab 1:2:4 with 60 kg steel per cum | 4.3 | cum | 10,000 ₹43,000 Lowest | 10,000 ₹43,000 Lowest |
| 10.00 | Providing & fixing of Jungla & Man hole complete (CSR item 18.4) | 80 | KG | 100 ₹8,000 | 99 ₹7,920 Lowest |
Tender Value
₹66.1 L
EMD Value
₹1.3 L
Closing Date
15 Jul 2025, 5:00 pmClosed
Executive Engineer Devigarh Patiala Division
Executive Engineer/Devigarh Patiala Canal and Ground Water Division WRD Punjab Patiala
ESTIMATE FOR LAYING UGPL OF O/L RD 61500 TL OF 1-L DISTY.
2025_WR_137932_103
01/2025-26
Open Tender
Civil Works
Item Rate
60 days
Near fatehgarh sahib
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹1.3 L
Yes
21 Aug 2026
8 Jul 2025
16 Jul 2025
8 Jul 2025
15 Jul 2025
8 Jul 2025
Amount
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect.
Lowering, jointing of RCC NP-2 plain end pipes 600 mm dia laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of renches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
cement concrete 1:4:8
Cement concrete 1:2:4
Shuttering for concrete faces
First class burnt brick work laid in cement sand mortar 1:6
10 mm thick Cement Plaster 1:4 on Side Walls
RCC slab 1:2:4 with 60 kg steel per cum
Providing & fixing of Jungla & Man hole complete (CSR item 18.4)
Providing & placing of Steel foot steps complete
Jointing & Cutting of RCC Plain End NP-2 pipes 150 mm dia into trenches & laying same in correct alignment
Shutter Arrangement 600 mm
Providing and Fixing Alfa Valve dia 600 mm
10 mm Thick cement plaster 1:4 on floor and Top of side walls
JATTANA CONSTRUCTION CO (BID ID -661081)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .