Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹51.7 L
Closing Date
14 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
20 conditions · 5 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF AUDITED BALANCE SHEET.
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF ANNEXURE VI-B.(Proforma is available in document).
1.1 Definition Of Similar Work: -For Execution of FOB works = Rs. 49439368 Similar nature of Work: Any bridge work involving fabrication, erection & launching of FOB/ Steel Girders/Composite Girder for Railway, Road Bridges. i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
1.2 Definition Of Similar Work: -For Execution of various civil works = Rs. 20,91,59,335.00 Similar nature of Work: Any Civil Engineering work i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
71 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
CPWD DSR-2023 (Delhi Schedule of Rates) and CPWD Specifications-2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 16.01.2023 with latest Correction Slips issued from time to time by CPWD.
Performance Guarantee As per ACS-11 dtd 13.03.2026 Para 16(4)(h) Introduced to GCC Apr2022 is as under Para 16(4)(h) If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by bider as below - Bid quoted Below 0 to 5 % (inclusive) of advertised cost - Additional Performance Guarantee (%) = NIL Bid quoted Below 5 % - of advertised cost - Additional Performance Guarantee (%) = 5%
Signature on Receipts for Amount.
Every receipt for money which may become payable or for any security which may become transferable to the Contractors under these presents, shall, if signed in the partnership name by anyone of the partners of a Contractor's firm be a good and sufficient discharge to the Railway in respect of the moneys or security purported to be acknowledged thereby and in the event of death of any of the Contractor, partners during the pendency of the contract, it is hereby expressly agreed that every receipt by anyone of the surviving Contractor partners shall if so signed as aforesaid be good and sufficient discharge as aforesaid provided that nothing in this Clause contained shall be deemed to prejudice or effect any claim which the Railway may hereafter have against the legal representative of any Contractor partner so dying for or in respect to any breach of any of the conditions of the contract, provided also that nothing in this clause contained shall be deemed to prejudice or effect the respective rights or obligations of the Contractor partners and of the legal representatives of any deceased contractor partners interse. (GCC April 2022 para 53.)
Applicability of rules for this tender
GCC-April 2022 with upto date correction slip.
CPWD DSR-2018 (Delhi Schedule of Rates) and CPWD Specifications-2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 01.06.2021 with latest Correction Slips issued from time to time by CPWD.
Relevant IS-CODES AND RAILWAY CODES AND MANUALS.
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
(a)"General Condition of Contract" shall mean General Conditions of Contract-April 2022 as contained in Western Railway, Engineering Department "Indian Railways Unified standard specifications (works and materials)Vol-I &II".
"Specifications" shall mean the Specifications for Materials and Works of the Railway as specified under the authority of the Ministry of Railways or Chief Engineer or as amplified, added to or superseded by special specifications if any, appended to the Tender Forms. (GCC April 2022 Part I para I Instructions to tenderers (ITT).)
Standard Schedule of Rates (SSOR) shall mean the schedule of Rates adopted by the Railway, which includes- 1."Unified Standard Schedule of Rates of the Railway (USSOR)" i.e. the Standard Schedule of Rates of the Railway issued under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents; 2. "Delhi Schedule Of Rates (DSR)" i.e. the Standard Schedule of Rates published by Director General/ Central Public Works Department, Government of India, New Delhi, as adopted and modified by the Railway under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents.
"If any dispute arises between the parties with respect to this agreement any application or suit shall be instituted only in the; court with the local limits or whose Jurisdiction, the Western Railway's Divisional Headquarters office is situated and both the parties shall be bound by this clause. (Head quarters letter no. CE-Circular No. 11/No. W/623/5/ARB/1 dt. 26.04.04)
Ratlam-Provision of Additional Loop Line with other ancillary works such as extension of existing FOBs, RUB , platforms and providing retaining wall , side drain etc.
RTM-2026-27-122~WR
RTM-2026-27-122
Open
Works - General
9 Months
Ratlam, Madhya Pradesh
₹0
₹51.7 L
20 Nov 2026
20 Nov 2026
30 Nov 2026
90 days
139 items across 16 schedules · ₹17,84,04,767.53 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1 in 12 Turnout (Under Traffic Block) | Set | 1.00 | 41,060.82 | 41,060.82 |
| 2 | Derailing Switch (Under conditions not requiring Traffic Block). | Set | 1.00 | 6,689.24 | 6,689.24 |
| 3 | 1 in 12 Turnouts | Set | 4.00 | 22,541.03 | 90,164.12 |
| 4 | Derailing Switch | Set | 1.00 | 9,167.35 | 9,167.35 |
| 5 | 1 in 12 Turnouts | Set | 4.00 | 63,463.61 | 2,53,854.44 |
| 6 | Derailing Switch | Set | 1.00 | 12,010.73 | 12,010.73 |
| 7 | For rails/panels of more than 40m length - Under Traffic | RM | 2000.00 | 46.35 | 92,700 |
| 8 | For sleeper density of 1660 sleepers per km | TRM | 1000.00 | 335.55 | 3,35,550 |
| 9 | Carrying out cut & connection to the existing PSC sleeper track under line block of any rail section and sleeper density to connect the same to newly linked track which is laid by the side, duly carrying out cutting of rails, insertion of additional PSC sleepers, if required, providing fish plated joints including drilling of holes, slewing required length of both tracks to prescribed alignment, adjusting sleeper spacing, providing continuity to track, spreading of ballast to provide cushion, shoulder ballast to the track stretch, giving one round of initial packing to make track fit for 20 kmph speed and boxing of ballast to profile as directed by Engineer in charge. | Each | 1.00 | 68,706.94 | 68,706.94 |
| 10 | Construction of Sanded Dead End as per RDSO's Drawing no. RT-347 (with all amendments) with brick-work using country bricks or CC bricks in mud mortar and filling with river coarse sand, surrounding rails and filling around. Note: Cost of brick and sand is not included in the rate. | Each | 1.00 | 11,719 | 11,719 |
| 11 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 1000.00 | 111.67 | 1,11,670 |
| 12 | 1 in 12 Turnout | Each | 1.00 | 65,366.95 | 65,366.95 |
| 13 | 60 Kg - 110/90 UTS - On Running Line | Each | 80.00 | 310.82 | 24,865.6 |
| 14 | On Running Line | Each | 100.00 | 78.7 | 7,870 |
| 15 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck/trailer. | MT | 120.00 | 216.82 | 26,018.4 |
| 16 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck/trailer. | MT | 100.00 | 206.4 | 20,640 |
| 17 | For lead up to 500 metre. | MT | 20.00 | 410.32 | 8,206.4 |
| 18 | For lead up to 500m | MT | 20.00 | 463.74 | 9,274.8 |
| 19 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 120.00 | 156.8 | 18,816 |
| 20 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer | MT | 500.00 | 178.3 | 89,150 |
| 21 | I n Wagon/Truck / trailer where mechanical handling is possible and traffic block is not required. | MT | 200.00 | 205.96 | 41,192 |
| 22 | Lead beyond 50 Km and up to 100 Km | MT | 10.00 | 662.06 | 6,620.6 |
| 23 | Lead beyond 50 Km and up to 100 Km | MT | 700.00 | 538.74 | 3,77,118 |
| 24 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 500.00 | 478.8 | 2,39,400 |
| 25 | All type of PSC sleepers | MT | 100.00 | 516.47 | 51,647 |
| 26 | P.Way fittings of all types and other similar loose items | MT | 10.00 | 414.33 | 4,143.3 |
| 27 | Boards with single post | Each | 10.00 | 644.57 | 6,445.7 |
| 28 | Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour, materials including cement, tools and plants etc. | Each | 2.00 | 525.14 | 1,050.28 |
| 29 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 400.00 | 846.09 | 3,38,436 |
| 30 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 100.00 | 2,118.4 | 2,11,840 |
| 31 | Tractor with Trolley for local transportation or other misc. works. | Hour | 100.00 | 599.84 | 59,984 |
| 32 | Manufacturing and fixing buffer stop with Railway supplied rails, cutting, including bending of rails as per plan ,with all contractor's labour, materials, tools, plants etc. and all lead and lift including crossing of track where necessary and as directed by Engineer in charge at site. Note: Excavation, fixing rails in cement concrete, drilling of holes will be paid separately. | Each | 1.00 | 18,844.36 | 18,844.36 |
| Schedule total | ₹26,60,222.03 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LETTEROFCREDITASMODEOFPAYMENT062018.pdf
ATTACHMENT
GCC2022CorrectionSlipNo12_11zon.pdf
ATTACHMENT
Safetyrules.pdf
ATTACHMENT
ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
ATTACHMENT
PROCEDUREORDERFORENSURINGSAFETYATWORKSITE.pdf
ATTACHMENT
NOrelativecertificate.pdf
ATTACHMENT
certificateforrailwayemployeereengagement_1.pdf
ATTACHMENT
TERMINATIONCONTRACT.pdf
ATTACHMENT
ACS5GCC2022.pdf
ATTACHMENT
07.08.23ACS4.pdf
ATTACHMENT
07.08.23LAUNCHEMB.pdf
ATTACHMENT
BidCapacity-AnnexureVI.pdf
ATTACHMENT
OffloadingPartSofworkRBLetterNo2022-CE-I-CT-GCC-2020-Polociydt27Apr2022.pdf
ATTACHMENT
BidsecurityAnnexure-VIA.pdf
ATTACHMENT
FormatforAnnualcontractualturnoverAnnexure-VIB.pdf
ATTACHMENT
GCCAPRIL2022.pdf
ATTACHMENT
MOUFORJVGCCAPRIL22WITHALLACS.pdf
ATTACHMENT
AnnexureVasperACS4dt07.08.2023.pdf
ATTACHMENT
AnnexureVA.pdf
ATTACHMENT
ACS6GCC2022.pdf
ATTACHMENT
ACS2dt13Dec22.pdf
ATTACHMENT
ACS1GCCAPR2022.pdf
ATTACHMENT
ACS3dt26APR23.pdf
ATTACHMENT
LetterNo.2017-CE-I-CT-9date31May2023.pdf
ATTACHMENT
GCC2022CorrectionSlipNo11.pdf
ATTACHMENT
GCC2022CorrectionSlipNo9.pdf
ATTACHMENT
GCC2022CorrectionSlipNo7.pdf
ATTACHMENT
PBGPerformaforTenderdocument30Aug2025.pdf
ATTACHMENT
GCC2022CorrectionSlipNo10.pdf
ATTACHMENT
GCC2022CorrectionSlipNo8.pdf
ATTACHMENT
PCECIRCULAR73.pdf
ATTACHMENT
1LetterrelatedtouseofRiversand.pdf
ATTACHMENT
2Recommendedmakermanufacturerofcivilmaterials.pdf
ATTACHMENT
3PCECircular88forQualityofWorks.pdf
ATTACHMENT
4corrigendumforsafetyatworkssites.pdf
ATTACHMENT
5JPOforCompositeTenderofCivilElectricalworksforBuildingWorks-R2.pdf
ATTACHMENT
dainikkaaryanishpaadananumatipatra.pdf
ATTACHMENT
Specialconditiontrackwork2025TRR.pdf
ATTACHMENT
SpecialConditionforATWelding.pdf
ATTACHMENT
SpecialconditionofRUBs.pdf
ATTACHMENT
FOBcondition.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .