| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.6 LAccepted-AOC NO 22 PUDHU NAGAR MUTHUPILLAIPALAYAM OULGARET POST PUDUCHERRY 605 010 | PONDICHERRY | PUDUCHERRY | 605010 | 1 | Accepted-AOC L1 | |
| 2 | 2₹28.1 L+₹1.6 L (5.85%)Rejected-Finance 23 MULLAI STREET BHARATHI NAGAR ARIYANKUPPAM PUDUCHERRY 605 007 | PONDICHERRY | PUDUCHERRY | 605007 | 2 | Rejected-Finance He is 2nd lowest hence h rejected | |
| 3 | 3₹28.2 L+₹1.6 L (6.15%)Rejected-Finance | 3 | Rejected-Finance He is 3rd lowest hence rejected | |
| 4 | 4₹29.6 L+₹3.0 L (11.4%)Rejected-Finance | 4 | Rejected-Finance He is 4th lowest hence h rejected | |
| 5 | 5₹30.4 L+₹3.8 L (14.4%)Rejected-Finance | 5 | Rejected-Finance He is 5th lowest hence h rejected |
Tender Value
₹31.3 L
EMD Value
₹62,501
Closing Date
21 Jan 2020, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer, BRS, PWD, Puducherry
Providing barbed wire fencing over the outer security wall including painting and replacement of quarters gate in Central Prison Campus, Kalapet , Puducherry
2020_PWDC1_5587_1
28/PW/EE/BRS/2019-20
Open Tender
Civil Works - Buildings
Item Rate
90 days
Puducherrry
Please refer Tender documents.
3 documents required · 3 mandatory
₹525
Payable To
₹62,501
18 Mar 2020
9 Jan 2020
22 Jan 2020
9 Jan 2020
21 Jan 2020
9 Jan 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms , lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m -All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:4:8 (1 cement:4coarse sand : 8 graded stone aggregate 40mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement -All work upto plinth level : 1:1.5:3 (1 cement : 1 .5 coarse sand : 3 graded stone aggregate 20mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5coarse sand : 3 graded stone aggregate 20mm nominal size)
Centring and shuttering including strutting, propping etc.and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete.- Using steel sheet with M.S.frames
Centring and shuttering including strutting, propping etc. and removal of form for: columns, pillars, piers, abutments, posts and struts.- Using steel sheet with M.S.frames
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete - Thermo - Mechanically treated bars (TISCON / VIZAG / IISCO /SAIL / JSW) including placing the M30 grade Athees make cover block @ 60cm centre to centre
Steel work welded in built up section/ framed work including cutting hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In grating, frames, guard bar, ladder, railings, brackets, gates and similar works.
6mm cement plaster of mix 1:3 (1 cement : 3 fine sand).
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade - Two or more coats on new work.
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - One or more coats on old work.
Finishing walls with Acrylic Smooth exterior paint of required shade - Old work (Two or more coats applied @ 1.67 lts/10 sqm.) on existing cement paint surface
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - 1:3:6 or richer mix.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal two diagonals interwoven with horizontal wires, of barbed wire 9.38kg per 100m (minimum) between the two posts fitted and fixed with G.I staples , turn buckles etc.complete (cost of posts struts, earth work and concrete work to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used.-with G.I barbed wire
Providing two legged scaffolding using 15 cm diameter blue-gum posts or casurina posts or best quality bamboo posts of 4m over all length (3.0m heigh + 0.5m projection + 0.5 into the ground ) the distance between the two rows being 1.25m and the spacing of posts with 0.5m overlap on either side and braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc in a complete form using coir and nails 1m run (Rate of scaffolding for a height of 3m and length of 1m)
Extra for providing two legged scaffolding for every additional height of 2.5m (Rate for scaffolding for a height of 3m and length of 1m)
asaravanan
Balamuruga Engineers and Contractors
ASOKAN V
P VETRIVEL
Hayagreeva varadane
K Siva
Gowri Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .