Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 CrAccepted-AOC | ₹38.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹42.8 CrRejected-Finance 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹42.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹43.6 CrRejected-Finance MOH PADAW NAWABGANJ GONDA U P 271303 | GONDA | UTTAR PRADESH | 271303 | ₹43.6 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹52.4 CrRejected-Finance B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹52.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹54.0 CrRejected-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | ₹54.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | S and P Infrastructure Developers Pvt. Ltd. L6 | M/s Alok Construction L5 | SHIV CONSTRUCTION L3 | UMESH CHANDRA MISHRA L4 | Bansal Highway Infratech Pvt Ltd L2 | C S Infraconstruction Limited L7 | M/s Chopra Traders L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous road surface to a depth of 20 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. | 30,870 | Sqm | 3.5 ₹1.1 L | 3.6 ₹1.1 L | 5 ₹1.5 L | 3 ₹92,610 | 3.5 ₹1.1 L | 3.7 ₹1.1 L | 3.65 ₹1.1 L |
| 2.00 | Excavation for trench of roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.as per clause 301(3.1) | 13,420 | Cum | 55 ₹7.4 L | 57 ₹7.6 L | 40 ₹5.4 L | 50 ₹6.7 L | 110 ₹14.8 L | 58 ₹7.8 L | 54 ₹7.2 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 | 1,32,830 | Cum | 265 ₹3.5 Cr | 270 ₹3.6 Cr | 90 ₹1.2 Cr | 146 ₹1.9 Cr | 140 ₹1.9 Cr | 271 ₹3.6 Cr | 120 ₹1.6 Cr |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 | 34,120 | Cum | 135 ₹46.1 L | 145 ₹49.5 L | 90 ₹30.7 L | 146 ₹49.8 L | 140 ₹47.8 L | 140 ₹47.8 L | 138 ₹47.1 L |
| 5.00 | Construction of subgrade and earthen soulders with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 | 34,570 | Cum | 280 ₹96.8 L | 275 ₹95.1 L | 90 ₹31.1 L | 170 ₹58.8 L | 120 ₹41.5 L | 281 ₹97.1 L | 125 ₹43.2 L |
| 6.00 | Construction of Subgrade and earthen soulder,s deposited from roadway (Compaction only) | 13,420 | Cum | 60 ₹8.1 L | 71 ₹9.5 L | 30 ₹4.0 L | 68 ₹9.1 L | 60 ₹8.1 L | 65 ₹8.7 L | 61 ₹8.2 L |
| 7.00 | Construction of granular sub-base Grade -1 by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 13,420 | Cum | 4,700 ₹6.3 Cr | 4,800 ₹6.4 Cr | 4,000 ₹5.4 Cr | 4,800 ₹6.4 Cr | 3,850 ₹5.2 Cr | 4,800 ₹6.4 Cr | 3,500 ₹4.7 Cr |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 28,470 | Cum | 6,000 ₹17.1 Cr | 6,050 ₹17.2 Cr | 5,245 ₹14.9 Cr | 5,600 ₹15.9 Cr | 4,200 ₹12.0 Cr | 6,100 ₹17.4 Cr | 4,500 ₹12.8 Cr |
| 9.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,28,470 | Sqm | 41 ₹52.7 L | 42 ₹54.0 L | 20 ₹25.7 L | 35 ₹45.0 L | 28 ₹36.0 L | 42 ₹54.0 L | 42 ₹54.0 L |
| 10.00 | Providing and laying dense graded bituminous macadam Grade- 2 with higher capacity batch type HMP (120 TPH) using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 8,350 | Cum | 13,050 ₹10.9 Cr | 13,200 ₹11.0 Cr | 10,800 ₹9.0 Cr | 13,200 ₹11.0 Cr | 10,100 ₹8.4 Cr | 13,265 ₹11.1 Cr | 10,500 ₹8.8 Cr |
Tender Value
₹57 Cr
EMD Value
₹57 L
Closing Date
28 Jul 2025, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Widening and Strenthening of Itiyathok Shrinagar Road
2025_CEDPW_1052400_1
2937/98Com-Gonda Circle/25-26 Dt. 19.6.25
Open Tender
Civil Works
450 days
GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
₹57 L
Yes
GONDA
6 Oct 2025
1 Jul 2025
28 Jul 2025
1 Jul 2025
28 Jul 2025
1 Jul 2025
4 Jul 2025
Amount
Scarifying the existing bituminous road surface to a depth of 20 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
Excavation for trench of roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.as per clause 301(3.1)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2
Construction of subgrade and earthen soulders with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2
Construction of Subgrade and earthen soulder,s deposited from roadway (Compaction only)
Construction of granular sub-base Grade -1 by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and laying dense graded bituminous macadam Grade- 2 with higher capacity batch type HMP (120 TPH) using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Technical Specification Clause 503.
Providing and laying bituminous concrete Grade-2 with higher capacity batch type hot mix plant (120 TPH) using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 35 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
CONSTRUCTION OF DRAIN Excavation in foundation in ordinary Soil. including lift up to 1.5m and lead up to 30m (100 ft) and including filling. Watering and ramming of excavated earth in to the trenches or in to the space between the structure and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer– in–charge up to distance of 30.00 m (100 ft) from the foundation trenches as per MORT&H 301
Cement concrete with 4 cm. (1/2") gauge brick ballast, aproved fine sand, cement in the proprtion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work as per SI No.275
Cement concrete with 4 cm. (1/2") gauge approved granit stone ballast, aproved coarse sand, cement in the proprtion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work as per SI No.281
R.C.C. work cement approved coarse sand, and 2 Cm. (3/4") gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforeement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including neaessary centering and shuttering etc. and also including supply of all materials labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost for: SI no 288.
Mild steel or iron in plain work such as in reinforced concrete / brick work (when not included in overall rates) wrought to required shape as necessary I/C bending for proper completion of the work and including supply of steel, it's wastage and hooks and authorized over lapping shall be measured. SI no 504(b).
Class- 150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials labour and ltools and p;ants etc. required for proper completion of the work.SI no 305 (b).
Stuck pointing in 1:2 cement and fine sand mortar on brick work including supply of all materials, labour and T and P etc Requuired for proper completion of work as per S.I No. 574, Chapter 13
Laying Reinforced Cement Concrete Pipe 1000mm dia NP3 / Prestressed Concrete Pipe on First Class Bedding in Single Row as per SOR Non Sch. C
Laying Reinforced Cement Concrete Pipe 600mm dia NP3 / Prestressed Concrete Pipe on First Class Bedding in Single Row as per SOR
Routine Maintenance of road after completion of work :- (A) Carriageway/ Pavement: (a) Potholes, cracks, other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC) (B) Road, Embankment, Cutings, Shoulders, Trees & Plantation : (a) Road Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficent slopes, rain cuts in embankments (E/W), Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-Silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/distrubed boulder pitching, breast/toe wall retaining wall, apron flooring, guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-strucures, (f) Any defects in superstructures, raillings, parapets. (g) Wearing coat, (h) Approach slab, (i) Painting & Lettering of No. plates, repair. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC- 1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stone & sign boards. (b) 200 m Stones, (c) Km stones, (d) 5th km stones. Maintenance requriment as per above and Mentioned in Special Condition of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost :
a) For Ist Year @ 0.00%
b) For IInd Year @ 0.25%
c) For IIIrd Year @ 0.50%
d) For IVth Year @ 0.75%
e) For Vth Year @ 1.00%
Bansal Highway Infratech Pvt Ltd (BID ID -5382397)
SHIV CONSTRUCTION (BID ID -5357283)
UMESH CHANDRA MISHRA (BID ID -5358318)
M/s Alok Construction (BID ID -5348794)
S and P Infrastructure Developers Pvt. Ltd. (BID ID -5348314)
C S Infraconstruction Limited (BID ID -5348715)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid