Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-Finance IN FRONT OF POLYTECHNIC COLLEGE MUDIYA KHERA MURENA DISTRICT MURENA MADHYA PRADESH | MURENA | MURENA | MADHYA PRADESH | ₹4.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹5.0 CrRejected-Finance | ₹5.0 Cr | L2 | Rejected-Finance Not L1 |
| 3 | L3₹5.1 CrRejected-Finance GALI NO 1 BESIDE HANUMAN MANDIR CHANDMARI ROAD DHAWARI DISTRICT SATNA M P SATNA MADHYA PRADESH INDIA | ₹5.1 Cr | L3 | Rejected-Finance Not L1 |
| 4 | L4₹5.3 CrRejected-Finance | ₹5.3 Cr | L4 | Rejected-Finance Not L1 |
| 5 | L5₹5.4 CrRejected-Finance | ₹5.4 Cr | L5 | Rejected-Finance Not L1 |
Tender Value
₹6.8 Cr
EMD Value
₹6.8 L
Closing Date
27 Feb 2026, 5:00 pmClosed
Chief General Manager
MPRRDA HO, 3rd Floor, Vikas Bhawan, Arera Hills, Bhopal
Construction / Upgradation of Road/ CD works including maintenance for Five year after construction-UPG.
2026_MPRRD_479976_1
NIT-1249-UPG
Open Tender
Civil Works - Roads
365 days
Gwalior
Please refer Tender document
7 documents required · 7 mandatory
₹23,600
₹6.8 L
11 May 2026
6 Feb 2026
2 Mar 2026
6 Feb 2026
27 Feb 2026
7 Feb 2026
Road/Bridge Work
Construction/Upgradation of Rural Road and CDs under Package No. MP14UPG014 (Offer Based on MPRRDA SOR issued Effective from 01.01.2024) as per detailed BOQ attached in Annex-II A.
Please Enable Macros to View BoQ information
MPRRDA,PIU Gwalior
Bill of Quantity
Details for the Percentage(%) Rate Tender
Based on SSR 01.01.2024
District :-Gwalior PIU :- Gwalior, Package No. :- MP14UPG014
Dabra
Total
Amount of Construction Cost
Amount of Maintenance Cost
Total Amount of PAC
Guard stones Providing and fixing guard stones on curves or at any other place as directed by engineer incharge made of 220 X220X1000 mm hammer dressed stones / RCC M-15 and fixed 400mm into the ground in morum and broken agreegates block of size 500X500X500mm and painted with white and black bands in 2 coat with redimix enamel paint including excavation of pit etc. complete.
Proposed maintainance Rates for 3.75 m Carriage way Roads BT
Maintenance of Road for Ist Year after Construction
Maintenance of Road for IInd Year after Construction
Maintenance of Road for IIIrd Year after Construction
Maintenance of Road for IVth Year after Construction
Maintenance of Road for Vth Year after Construction
Proposed maintainance Rates for All Carriage way Roads CC
Maintenance of Road for Ist Year after Construction
Maintenance of Road for IInd Year after Construction
Maintenance of Road for IIIrd Year after Construction
Maintenance of Road for IVth Year after Construction
Maintenance of Road for Vth Year after Construction
Total maintenance
GENERAL MANAGER
MPRRDA,PIU
Gwalior
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.81 MB
Tendernotice_2.pdf
PDF • 4.34 MB
BOQ_564048.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid