| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹10.1 LRejected-AOC | ₹10.1 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | CHINNAMUTHU L2 | VCP Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub soils exceipt hard rock requiring blasting with intial lead and lift including re-filling the sides of foundation and depositing the surplus earthWithin the site area as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23 & 24 VI (s2), VII 9,10 | 120 | M3 | 22,800 ₹22,800 | 22,080 ₹22,080 |
| 2.00 | Plain Cement concrete Using 1:4:8 mix using 40mm ISS gauge HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V, VI (S5A) VII | 28 | M3 | 1,49,800 ₹1.5 L | 1,48,988 ₹1.5 L |
| 3.00 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10 stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all material to site etc., complete complying with standard specification. TNDSS NO: 20 & 85 (For Side wall) | 509 | M2 | 2,34,140 ₹2.3 L | 2,33,631 ₹2.3 L |
| 4.00 | Plain Cement Concrete 1:2:4 mix Using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specification. | 78 | M3 | 5,22,600 ₹5.2 L | 5,22,132 ₹5.2 L |
| 5.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 3.6 | M3 | 32,400 ₹32,400 | 32,191.2 ₹32,191.20 |
| 6.00 | Supplying, fabricating and placing in position M.S (or) R.T.S. for all Reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications.TNBP No:30 | 360 | Kgs | 32,400 ₹32,400 | 32,040 ₹32,040 |
| 7.00 | Finishing the top of flooring with granolithick flooring with cement concrete 1:2:4 using 10 to 12mm ISS HBG Stone Jelly of 25mm tk etc., Complete. including cost and conveyance of materials to work site & labour charges for mixing,laying,finishing and Curing etc,complete as per standard specifications . | 95 | M2 | 16,150 ₹16,150 | 15,580 ₹15,580 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
30 Jul 2025, 3:00 pmClosed
Executive Officer
Sithayankottai Town Panchayat
Construction of Storm Water Drain at 7th Ward Yogam Nagar in Sithayankottai Town Panchayat.
2025_DTP_586917_1
335/2025
Open Tender
Civil Works - Others
90 days
Sithayankottai Town Panchayat
Class 1
2 documents required · 2 mandatory
₹6,870
Yes
₹12,000
30 Jan 2026
29 Jul 2025
30 Jul 2025
29 Jul 2025
30 Jul 2025
29 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid