| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | ₹5.2 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | Not Admitted-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical 947 C ASHOK NAGAR COLONY HUMAYUNPUR POLICE STATION GORAKHNATH DISTRICT GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹12.7 L
Closing Date
16 Mar 2024, 11:00 amClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
RESTORATION AND DEMARCATION WORK ON RAMVAPUR DY. FROM KM. 0.000 TO KM. 17.160 IN DISTRICT GORAKHPUR
2024_UPIDC_909441_6
05/SE/2023-24
Open Tender
Civil Works
Item Wise
180 days
PARTAWAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹12.7 L
Yes
15 Oct 2024
11 Mar 2024
16 Mar 2024
11 Mar 2024
16 Mar 2024
11 Mar 2024
Amount
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work. etc. as per I.D. specification. (In VRB, In Syphon, Bamboo Bracing, Outlet)
Dry brick on Edge Soling on diversion including prepration of sub-grade to complete the work including all cost of mateial, labour and T&P etc.as per I.D. specification. (In VRB, On Service road, In Repair work)
Dismantling of old V.R.B. and Syphon and proper disposal including all cost of materials,T&P and labours etc.as per I.D. specification. (In VRB, In Syphon)
Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.as per I.D. specification. (In VRB, In Syphon)
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.and as per I.D. specification (In VRB, In Syphon)
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-chargeas per I.D. specification. (In VRB, In Gul, In Outlet, Boundary Pillar, Gauge, In Syphon)
Laying P.C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.0 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.as per I.D. specification (In VRB, In Outlet, In Syphon)
Centering and shuttering for R.C.C. work including all cost of materials, T&P labours and other accessories required for proper completion of work.as per I.D. Specification. (In VRB, Boundary Pillar, In Syphon and Repair Work)
1st class brick work in 1:4 cement mortar with 1st class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work.as per I.D. specification (In VRB, In Gul, In Outlet, CC Lining u/s and d/s of VRB, In Repair work, In Gauge, In Syphon)
Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack welding with material. and other accessories required for proper completion of work. As per direction of Engineer in Charge. as per I.D. specification (In VRB, Boundary Pillar)
Laying R.C.C. work in Slab, Bed block and C.C work in wearing coat, parapet top in 1:1:2 (M25) with sonbhadra coarse sand of FM. Not less then 2.0 and dala grit (10mm to 20mm.) including all cost of materials, T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge as per I.D. specification. (In VRB, In Repair Work)
Deep Struck pointing in 1:2 on Brick work, including all cost of materials, T&P and labours and other accessories required for proper completion of work as per I.D. Specification. (In VRB, In Outlet, Repair Work, In gauge and Syphon)
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work as per I.D. Specification. (In VRB)
Taking out brick on edge soling laid on top of diversion and stacking within 100m after completion of construction required for proper completion of work etc as per I.D. Specification. (In VRB)
Dry brick on Edge Soling on approch of VRB in both side with taking out bricks from already used in diversion required for proper completion of work etc as per I.D. Specification. (In VRB)
Fixing wheel guard stone including cost of all material, labour, t&p etc. required for proper completion of work.as per I.D. specification(In VRB and Repair work)
Sign borad at site for notice both side including cost of all material, labour, t&p etc. required for proper completion of work as per I.D. specification (In VRB and In Syphon)
Supply and fixing PVC pipe of dia 110 mm for drainage spout, labour, t&p etc. required for proper completion of work as per I.D. specification (In VRB)
Earth work for removal of diversion including all cost of materials, T&P and labours required for proper completion of work as per I.D. Specification. (In VRB)
Laying 85/100 grade bitumen painting between bedblock and slab etc required for proper completion of work as per I.D. Specification. (In VRB and CCLining)
Laying P.C.C. 1:4:8 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.00 and Brick ballast (20 mm to 40 mm.) including all cost of materials, T&P and labours and other accessories required for proper completion of work as per I.D. specification. (In Gul, In Gauge and In Syphon)
Laying C:C work in 1:2:4 (M 15) with sonbhadra coarse sand of FM. Not less then 2.00 and dala grit (10mm to 20mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge as per I.D. specification. (In Outlet, In Boundary Pillar)
Supply and Fixing of P.V.C. Pipe 160 mm 6 kg pressure I.S.I marked including cost of all material, labour, t&p etc. required for proper completion of work as per I.D. Specification. (In Outlet)
Supply and Fixing of P.V.C. Pipe 110 mm, 6 kg pressure I.S.I marked including cost of all material ,labour, t&p etc. required for proper completion of work as per I.D. Specification. (In Outlet)
Plaster in 1:3 C.M. on Brick work, including all cost of materials, T&P and labours and other accessories required for proper completion of work as per I.D. Specification. (In Gul and Gauge)
Laying R.C.C. and C.C. work in 1:1.5:3 (M 20) with sonbhadra coarse sand of FM. Not less then 2.0 and dala grit (10mm to 20mm.) including all cost of materials, T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge as per I.D. specification.(In Lining, In Boundary Pillar, In Syphon)
Painting of parapet, wall pillar and wing wall on distributaries and minors including all cost of material, labour and t&p etc as per I.D. Specification. (In Boundary Pillar, In Repair work)
Painting 1st coat over priming coat (but excluding cost of priming coat) on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping including cost of materials labour T&P etc. as required for proper completion of work. Paint shall be used as per standard I.S. specification as per I.D. specification. (Steel Gate)
Ordinary shuttering for C.C. Block and Concrete work including all cost of materials, T&P labours and other accessories required for proper completion of work as per I.D. Specification. (In CC Lining)
Ordinary jungle clearance with thorny bushes including all cost of materials, T&P labours and other accessories required for proper completion of work as per I.D. Specification.
Providing and Fixing bamboo strut 2.0 mtr long 5 to 8 cm. dia 1/3 rd length pilling in earth including cost of material, labour T&P etc. (0.30m c/c) as per I.D. Specification. (In Bamboo bracing)
Providing and Laying E.C. bags filled with earth /sand tying, sewing with sutali and laying in proper position including cost of material labour t&p etc @28 bag/cum as per I.D. Specification. (In Bamboo bracing)
Fixing of precast boundary Pillar including cost of material labour t&p etc. as per I.D. Specification. (In Boundary Pillar)
Silt clearance/trench/digging incl lift upto 1.5 M and lead upto 30M , incl. cost of driver/POL/ maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing and compaction etc.as per I.D. Specification.
Providing and laying of LDPE film on footing box including cost of material labour t&p etc. (In Boundary Pillar)
E/w for restoration of canal with using of earth on bank, Daula and Service road etc with proper dressing and manual compaction including cost of material, labour and T&P etc completed to the work site as per I.D. specification. (outlet & Canal Restoration)
Painting front face of gauge before printing the gauge scale including cost of material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge as per I.D. Specification.
Printing of Letter incl. material upto 30cm hieght including cost material, labour and T&P etc required for proper completion of work as per direction of Engineer -in -charge.as per I.D. specification (In Gauge)
Laying local sand filling with proper compaction of 100 mm thick for making sub-Grade etc including cost of all material, labour and T&P etc. With proper completion of work as per direction of Engineer in charge as per I.D. Specification. (In Lining, In Brick Soling)
Laying tarfelt paper/geo textile sheet 100gsm for sub grade including cost of all material, labour and T&P etc. proper completion of work as per direction of Engineer in charge as per I.D. Specification. (In Lining)
1st Class Brick on edge pitchting in slope and bed with 1:4 cement mortar including prepration of sub grade to prescribed slope filing jiont including cost of all material T&P etc. as per I.D. Specification. (In Syphon)
Supplying and laying of 1200 mm Dia NP-3 Pipe jointing and fixing pipe in position as per I.D. Specification. (In Syphon)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .