Loading…
Loading…
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
18 Sept 2026, 4:00 pm3d left
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of road from Takiya Samsun (Mohalla) to Lalwani Yarikha Budgam
2026_PWDJK_323774_1
NIT_No_76_DB_2026-27
Open Tender
Civil Works
Percentage
45 days
Yarikhah Khansahib
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Budgam
₹80,000
7 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
18 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : | 187.2 | CUM | 256.85 | ₹48,082.32 |
| 2 | P/L of stone soling handpacked tightly including ramming and all carriages of material | 14.04 | CUM | 1,000 | ₹14,040 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 9.36 | CUM | 5,202.9 | ₹48,699.14 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 113.1 | CUM | 6,591.25 | ₹7,45,470.38 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 312 | SQM | 286.35 | ₹89,341.2 |
| 6 | carriage of sand for avg lead of 40km by MT | 55.11 | CUM | 409.94 | ₹22,591.79 |
| 7 | Carriage of aggregates for avg lead of 20km by MT | 110.21 | CUM | 409.94 | ₹45,179.49 |
| 8 | P/L of GSB/Nallah Muck with stone aggregates, dust of specified grade including laying compaction with 80-100KN Road roller and all carriages complete job | 1,095 | CUM | 1,100 | ₹12,04,500 |
| 9 | Supplying, stacking,Laying, spreading and compacting stone aggregate of specified sizes( 63 to 45mm) to WBM specifications in uniform thickness, hand picking, including rolling with 3 wheeled road / vibratory roller 8-10tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening ( 13.2mm size) /binding material ( stone dust/moorum) to fill up interstices of coarse aggregate, watering and compacting to the required density( finished work shall be paid) with all leads , lifts and carriages as involved upto site of work. All complete job. | 547.5 | CUM | 2,900 | ₹15,87,750 |
| 10Prividing and fixing of RCC spun pipes including cushion of adequate thickness, excavtion of trench and refilling of trench, including carriage to site | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1090899.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .