| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 2 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 3 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 4 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 5 | Accepted-Technical | Accepted-Technical QUALIFIED |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
11 Aug 2026, 5:00 pmClosed
Chief Construction Engineer
Rural Works Circle, Sunabeda, At-Sunabeda-1, Near Jagannath Temple, PIN-763001, Dist-Koraput
Const. of New Upgraded Higher Secondary School buildings under Samagra Shiksha and Stars (Plus 2 Arts Stream) at Urubali UGHS under Kalimela Block 2025-26
2026_CERWI_136996_1
CCERWCSBD-Online-28/2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
MALKANGIRI
3 documents required · 3 mandatory
₹10,000
₹1.3 L
Yes
3 Sept 2026
27 Jul 2026
12 Aug 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
27 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation and foundation of structures upto 3 mtr depth as per drawing and technical specification cluse 1104 including setting out construction of shoring and bracing removal of stumps all complete as per direction of Enginee-in-charge. GROUND FLOOR | 378.15 | cum | 282.89 | ₹1,06,974.85 |
| 2 | Supplying filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished section only etc.complete as directed by the Engineer-in-charge. GROUND FLOOR | 311.38 | cum | 870.2 | ₹2,70,962.88 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer in charge. GROUND FLOOR | 92.76 | cum | 6,300.76 | ₹5,84,458.5 |
| 4 | Brick masonary in cement mortar (1:6) using Cement flyash of size 10 x 5 x 3 having crushing strength not lessthan 75 Kg/Cm2 after immersing the bricks for six hours in water before use in Foundation and plinth in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. GROUND FLOOR | 87.59 | cum | 6,362.42 | ₹5,57,284.37 |
| 5 | R.C.C. work with M-20 grade In Different Works having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position. GROUND FLOOR
Column Base | 75.39 | cum | 7,291.77 | ₹5,49,726.54 |
| 6 | Plinth Bend / Grade Beam GROUND FLOOR RCC M-20 | 17.41 | cum | 7,291.77 | ₹1,26,949.72 |
| 7 | Bedblock ( Window sill ) GROUND FLOOR RCC M-20 | 1.8 | cum | 9,813.84 | ₹17,664.91 |
| 8 | LINTEL BAND GROUND FLOOR RCC M-20 | 8.35 | cum | 15,026.41 | ₹1,25,470.52 |
| 9 | Column in Super structure GROUND FLOOR RCC M-20 | 18.93 | cum | 19,047.26 | ₹3,60,564.63 |
| 10 | ROOF BEAM GROUND FLOOR RCC M-20 | 31.67 | cum | 19,047.26 | ₹6,03,226.72 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.30 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_603195.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .