Tender Value
₹12.0 Cr
EMD Value
₹10 L
Closing Date
14 Sept 2026, 2:00 pm
Superintending Engineer/W.H.C.1/P.W.(R)D.
Office of the Superintending Engineer, Western Highway Circle No.-I, Purta Bhavan 1st Floor, Burdwan, Purba Bardhaman. 713103.
LINK ROAD TO MURARAI HEALTH CENTRE WITH EXTENSION UPTO BAJITPUR FROM 0.00KMP TO 0.800KM WIDENING and STRENGTHENING WORK AND FROM 0.800KM TO 7.00KM STRENGTHENING WORK INCLUDING CONSTRUCTION OF 11 Nos CD STRUCTURE UNDER BIRBHUM HIGHWAY DIVISION I
2026_WBPWD_5018522_1
WBPW(R)D/NIT- 01 of SE/WHC-I/2026-2027
Open Tender
CIVIL WORKS
Percentage
180 days
Burdwan
Please refer Tender documents.
8 documents required · 8 mandatory
₹10 L
Yes
Off of the S.E./W.H.C.1/P.W.(R)D.
17 Aug 2026
17 Aug 2026
16 Sept 2026
17 Aug 2026
14 Sept 2026
25 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COST FOR ROAD WORKS | |||||
| 1.01 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Mechanical Means
Bituminous course (Rate is including 1% Cess) | - | cum | 312.86 | - |
| 1.02 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Manual Means
Bituminous course (Rate is including 1% Cess) | 0.2 | cum | 587.83 | ₹116.98 |
| 1.03 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). (Rate is including 1% Cess) | 0.2 | cum | 85.55 | ₹17.02 |
| 1.04 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (land own/arranged by the Agency) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been includedin the rate. (Rate is including 1% Cess) | 16,258.32 | cum | 220.72 | ₹35,88,536.39 |
| 1.05 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (earth is available from Govt. land) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm. (Reference to MoRT&H's specification clause 305).
(Rate is including 1% Cess) | 16,258.32 | cum | 168.17 | ₹27,34,161.67 |
| 1.06 | Inverted Choke
Construction of inverted choke by providing, laying, spreading and compacting screening B type/ coarse sand of specified grade in uniform layer on a prepared surface with motor grader and compacting with power roller etc (Reference to MoRT&H's specification 404.3.2).
Using Coarse Sand 1.20 cum per cum and Water = 0.18 KL per cum. (Rate is including 1% Cess) | 138.42 | cum | 1,259.38 | ₹1,74,323.38 |
| 1.07 | 1 Granular Sub-Base with Graded Material
1A Plant Mix Method
Construction of granular sub-base byproviding graded material such asnatural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader onprepared surface, mixing byappropriate mechanical mixure (withcontrolled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximumdry density for the materialdetermined as per IS:2720 (Part 8),complete as per clause 401. (Rate is including 1% Cess)
Grading-II | 543.82 | cum | 1,683.53 | ₹9,15,537.28 |
| 1.08 | 1 Granular Sub-Base with Graded Material
1A Plant Mix Method
Construction of granular sub-base byproviding graded material such asnatural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader onprepared surface, mixing byappropriate mechanical mixure (withcontrolled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximumdry density for the materialdetermined as per IS:2720 (Part 8),complete as per clause 401. (Rate is including 1% Cess)
Grading-III | 543.82 | cum | 2,002.98 | ₹10,89,260.58 |
| 1.09 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate conforming to the grading of table 400- 13 revised vide table 2 of IRC : 109 (2015) to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density .The thickness of a single compacted layer shall not be less than 75 mm.(Reference to MoRT&H's specification 406.
(Rate is including 1% Cess) | 6,138.74 | cum | 1,907.84 | ₹1,17,11,733.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5089777.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].