Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC GONDA | UTTAR PRADESH | 271001 | ₹16.7 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹16.7 L+₹833.37 (0.05%)Rejected-Finance DUBEDIYA CHAITPUR GONDA | GONDA | GONDA | UTTAR PRADESH | ₹16.7 L+₹833.37 (0.05%) | L2 | Rejected-Finance IInd Lowest |
Tender Value
₹24.5 L
EMD Value
₹2.5 L
Closing Date
25 Apr 2026, 12:00 pmClosed
EE PD PWD Gonda
Office of EE PD PWD Gonda
Construction Work of Anganwadi Kendra Bhawan in Gram Panchayat Talaganj Grant
2026_CEDPW_1139063_2
1108 / 1A-Nivida Dated 18-04-2026
Open Tender
Civil Works - Buildings
Fixed-rate
60 days
Office of EE PD PWD Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
₹2.5 L
25 May 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineerin-charge. 2.6.1 All kinds of soil | - | Cum | - | - |
| 2 | Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift : 2.3.1 All kinds of soil | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stoneaggregate 40 mm nominal size derived from natural sources) | - | Cum | - | - |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement 5.33.1.1 All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | - | Cum | - | - |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement 5.33.2.1 All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum | - | Cum | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level.
& above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Shelves ( cast in situ ) | - | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Weather shed, Chajjas, corbels etc., including edges | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_2126769.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .