Tender Value
₹1.4 L
EMD Value
₹4,200
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O CULVERT ON NALLAH DANGI NHO ABDUL HAMEED GANIE, BASHIR GANIE AND OTHERS A HEWARD BLOCK VERINAG
2026_RDPR_325642_26
ENIT114of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,200
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 m from cutting edge | 11.33 | cum | 479.3 | ₹5,430.47 |
| 2 | P/L of stone soling tightly hand packed including a carriage | 3 | Cum | 900 | ₹2,700 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:ent concrete of (1:3:6) Mix M10 grade with aggregate size as 20mm | 6 | Cum | 5,733.6 | ₹34,401.6 |
| 4 | P/L in position Reinforced cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level M20 grade 1:1.5:3 | 3.44 | cum | 7,788 | ₹26,790.72 |
| 5 | Reinforcement for RCC works incld. straightening bending cutting placing in position and binding all complete (TMT Bars) | 344 | Kg | 110 | ₹37,840 |
| 6 | Reinforcement for railing incld. straightening bending cutting placing in position and binding all complete with primer | 100 | Kg | 120 | ₹12,000 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 14.75 | sqm | 286.35 | ₹4,223.66 |
| 8 | Suspended floor | 12.54 | sqm | 718 | ₹9,003.72 |
| 9 | Carriage of all material i.e sand/bajri i/c carriage | 13.6 | Cum | 515.26 | ₹7,007.54 |
| 10 | Add provision for PG/SB charges | 1 | LS | 800 | ₹800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1100895.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .