Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance | ₹5.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 LAdmitted-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | ₹5.3 L | L2 | Admitted-Finance |
| 3 | L3₹5.4 LAdmitted-Finance | ₹5.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAJESH KUMAR GOVT. CONTRACTOR L1 | SACHIN KUMAR SHARMA L3 | SURESH KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres to the entire staisfaction of Engineer-in-charge with in all leads and lifts. | 267.3 | Cum. | 550 ₹1.5 L | 600 ₹1.6 L | 590 ₹1.6 L |
| 2.00Providing, laying, jointing and testing of HDPE pipes in trenches to required grades as per IS: 4984-1995 latest with up to date amendments of following OD pipes, material grade and class of pipes. The jointing of pipes should be done by way of butt fusion welding as per relevant IS code and specifications including all fittings and accessories complete in all respect. | ||||||
| 2.01 | 75mm dia PE-80, PN-6.0 | 1,100 | Rmt. | 300 ₹3.3 L | 310 ₹3.4 L | 308 ₹3.4 L |
| 3.00Providing and fixing double flanged Cast Iron Sluice valve of follwing dia of Leader/Kirloskar/Kilburn/Kartar/all approved make conforming to as per IS: 14846-2000 with MS flanges IS: 6392-1971 with hand wheel (and other accessories) with upto amendment as per class PN-1.00 to with standing nominal seat pressure of 10.00 Kg/cm2 flange table-5 including welding of MS flange in two layer i/c carriage in all leads & lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | ||||||
| 3.01 | 80mm dia | 2 | Each | 16,000 ₹32,000 | 17,500 ₹35,000 | 17,450 ₹34,900 |
Tender Value
₹4.1 L
EMD Value
₹8,171
Closing Date
17 Feb 2026, 11:00 amClosed
EE JSD KATRAIN
JSD KATRAIN
SH Providing laying, jointing testing of HDPE pipes of 75 mm dia from Gorudug to storage tank at Shuru and providing supplying and fixing of C.I. sluice valve 80mm dia
2026_HPIPH_128077_1
8874-8923 dated 07.02.2026
Open Tender
Civil Works
MANALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹8,171
21 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid