Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.8 LAdmitted-Finance 135 CHAKRANA TIWARI CHAKA NAINI PRAYAGRAJ 211008 UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211008 | L1 | Admitted-Finance | |
| 2 | L2₹57.1 L+₹27,496.75 (0.48%)Admitted-Finance 1010 NANDANPURA BABINA CANTT DIST JHANSI 284401 | BABINA CANTT | JHANSI | UTTAR PRADESH | 284401 | L2 | Admitted-Finance | |
| 3 | L3₹57.7 L+₹89,772.15 (1.58%)Admitted-Finance NEAR PUMP HOUSE ROAD NEAR RED ROSE SCHOOL BABINA CANTT JHANSI DISTT UP 284401 | JHANSI | UTTAR PRADESH | 284001 | L3 | Admitted-Finance | |
| 4 | L4₹58.0 L+₹1.2 L (2.10%)Admitted-Finance 0 SANRPUR MISHRAULIYA PUCHPEDIYA ROAD SANTPUR MISHRAULIYA BASTI UTTAR PRADESH 272001 INDIA | BASTI | UTTAR PRADESH | 272001 | L4 | Admitted-Finance | |
| 5 | L5₹58.1 L+₹1.2 L (2.18%)Admitted-Finance 01 NEAR GOVERMENT HOSPITAL KOTHI BAZAR ROAD KOTHI SATNA MADHYA PRADESH 485666 | SATNA | MADHYA PRADESH | 485666 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Ritu Tandon L3 | V K Engineers and Associates L7 | VIJAY BUILDERS L1 | ADARSH ENTERPRISES L5 | RAVI TRADERS L4 | M/S Kharya Associates L6 | M/S M S Constructions L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Demolition of lime Cobba /PCC concrete of any description and in any position including dismntaling of APP/ felt in any description and in any position over roof & revomal of and disposal of debris/vegetation plant/trees and rubbish to low level area/500 mtr from site etc complete all as specified and as directed by the Engineer-in-Charge. | 48.75 | Cum | 230 ₹11,212.5 | 350 ₹17,062.5 | 220 ₹10,725 | 300 ₹14,625 | 450 ₹21,937.5 | 150 ₹7,312.5 Lowest | 351 ₹17,111.25 |
| 2.01 | M&L for P.C.C 1:2:4 type B-0 using 12.5 mm graded stone aggregate as in padding over roof finished and laid to required slope complete all as specified and as directed. | 48.75 | Cum | 3,800 ₹1,85,250 Lowest | 4,200 ₹2,04,750 | 4,000 ₹1,95,000 | 4,200 ₹2,04,750 | 4,400 ₹2,14,500 | 4,000 ₹1,95,000 | 4,000 ₹1,95,000 |
| 3.01 | M&L cutting out cracks to 'V' Section in existing roof or terracing, cleaning out, wetting and filling solidly a hot mixture of bitumen and dry sand in proportion of 1:1 by weight complete all as specified and as directed. | 40 | RM | 50 ₹2,000 | 100 ₹4,000 | 52 ₹2,080 | 40 ₹1,600 Lowest | 129 ₹5,160 | 80 ₹3,200 | 50 ₹2,000 |
| 4.01 | Cutting grooves in brick wall 75mm wide and 65mm deep and shaping horizontal face of groove with cement mortar 1:3 complete all as specified and as directed. | 70 | RM | 80 ₹5,600 | 95 ₹6,650 | 75 ₹5,250 | 40 ₹2,800 Lowest | 129 ₹9,030 | 85 ₹5,950 | 80 ₹5,600 |
| 5.01 | M&L, roughening surfaces of old concrete roof by picking ,sweeping clean and washing down with water to remove dust etc and applying a coat of cement slurry @ 3 Kg per Sqm complete all as specified and directed. | 650 | Sqm | 55 ₹35,750 | 26.5 ₹17,225 | 52 ₹33,800 | 42 ₹27,300 | 27 ₹17,550 | 52 ₹33,800 | 20 ₹13,000 Lowest |
| 6.01 | M&L for 10 mm thick rendering in cement mortar 1:4 on concrete surfaces when concrete is stil green finished even and fair including mixing of water proofing compound as per manufacturer instruction etc complete all as specified and as directed.Note :- Water proofing compound shall be measured separately as supply only in item no 07 | 650 | Sqm | 190 ₹1,23,500 | 265 ₹1,72,250 | 185 ₹1,20,250 | 170 ₹1,10,500 | 210 ₹1,36,500 | 225 ₹1,46,250 | 110 ₹71,500 Lowest |
| 7.01 | Supply only Liquid water proofing compound complete all as specified and as directed of as per manufacturer instruction. | 126.75 | Ltr | 130 ₹16,477.5 | 75 ₹9,506.25 Lowest | 120 ₹15,210 | 150 ₹19,012.5 | 210 ₹26,617.5 | 160 ₹20,280 | 100 ₹12,675 |
| 8.01 | M&L applying water proofing treatment with the following :-(a) First coat of bitumen primer conforming to IS-3384 @ 0.3Kg / sqm to be applied on prepared surface till the surface is properly impregnated.(b) After the application of approved bituminous primer the water proofing memberne minimum weight 3kg/sqm and minimum 3mm thick reinforced with polyesterd non woven fabric (weight not less then 160gms/sqm) shall be laid on the primed surface by torch application method as per manufactured instruction.(c) All joints and change in direction should be curved with cement mortar (1:3) mixed with SBR latex @ 200ml per bag on cement and cured well before laying of membrane.( d ) M&L for preparation of newly surface of APP membrane and applying two coat of bituminous aluminium paint @200 gm /sqm etc complete all as specified and as directed. | 650 | Sqm | 660 ₹4,29,000 | 695 ₹4,51,750 | 650 ₹4,22,500 | 560 ₹3,64,000 Lowest | 665 ₹4,32,250 | 680 ₹4,42,000 | 590 ₹3,83,500 |
| 9.01 | Taking up or down existing steel tubing and connections including cleaning for refixing or removal to store complete all as specified and as directed for 15 mm dia bore | 100 | RM | 30 ₹3,000 | 40 ₹4,000 | 20 ₹2,000 | 18 ₹1,800 | 20 ₹2,000 | 8 ₹800 Lowest | 10 ₹1,000 |
| 10.01 | Taking up or down existing steel tubing and connections including cleaning for refixing or removal to store complete all as specified and as directed for 20 mm dia bore | 80 | RM | 30 ₹2,400 | 40 ₹3,200 | 20 ₹1,600 | 20 ₹1,600 | 25 ₹2,000 | 10 ₹800 Lowest | 10 ₹800 Lowest |
Tender Value
₹46.8 L
EMD Value
₹91,680
Closing Date
24 Jun 2026, 6:00 pmClosed
GE Babina
GE Babina PIN-284401
SPL REPAIR TO BLDG NO P-32 (01 TO 08) OR MD ACCN AT ZONE 3 UNDER AGE B/R-I UNDER GE BABINA
2026_MES_768101_1
8526/E8
Open Tender
Civil Works
Item Rate
180 days
GE Babina
As per tender documents
8 documents required · 8 mandatory
₹500
GE Babina
₹91,680
Yes
9 Jul 2026
26 May 2026
26 Jun 2026
26 May 2026
24 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolition of lime Cobba /PCC concrete of any description and in any position including dismntaling of APP/ felt in any description and in any position over roof & revomal of and disposal of debris/vegetation plant/trees and rubbish to low level area/500 mtr from site etc complete all as specified and as directed by the Engineer-in-Charge. | - | Cum | - | - |
| 2.01 | M&L for P.C.C 1:2:4 type B-0 using 12.5 mm graded stone aggregate as in padding over roof finished and laid to required slope complete all as specified and as directed. | - | Cum | - | - |
| 3.01 | M&L cutting out cracks to 'V' Section in existing roof or terracing, cleaning out, wetting and filling solidly a hot mixture of bitumen and dry sand in proportion of 1:1 by weight complete all as specified and as directed. | 40 | RM | - | - |
| 4.01 | Cutting grooves in brick wall 75mm wide and 65mm deep and shaping horizontal face of groove with cement mortar 1:3 complete all as specified and as directed. | 70 | RM | - | - |
| 5.01 | M&L, roughening surfaces of old concrete roof by picking ,sweeping clean and washing down with water to remove dust etc and applying a coat of cement slurry @ 3 Kg per Sqm complete all as specified and directed. | - | Sqm | - | - |
| 6.01 | M&L for 10 mm thick rendering in cement mortar 1:4 on concrete surfaces when concrete is stil green finished even and fair including mixing of water proofing compound as per manufacturer instruction etc complete all as specified and as directed.Note :- Water proofing compound shall be measured separately as supply only in item no 07 | 650 | Sqm | - | - |
| 7.01 | Supply only Liquid water proofing compound complete all as specified and as directed of as per manufacturer instruction. | - | Ltr | - | - |
| 8.01 | M&L applying water proofing treatment with the following :-(a) First coat of bitumen primer conforming to IS-3384 @ 0.3Kg / sqm to be applied on prepared surface till the surface is properly impregnated.(b) After the application of approved bituminous primer the water proofing memberne minimum weight 3kg/sqm and minimum 3mm thick reinforced with polyesterd non woven fabric (weight not less then 160gms/sqm) shall be laid on the primed surface by torch application method as per manufactured instruction.(c) All joints and change in direction should be curved with cement mortar (1:3) mixed with SBR latex @ 200ml per bag on cement and cured well before laying of membrane.( d ) M&L for preparation of newly surface of APP membrane and applying two coat of bituminous aluminium paint @200 gm /sqm etc complete all as specified and as directed. | 650 | Sqm | - | - |
| 9.01 | Taking up or down existing steel tubing and connections including cleaning for refixing or removal to store complete all as specified and as directed for 15 mm dia bore | 100 | RM | - | - |
| 10.01 | Taking up or down existing steel tubing and connections including cleaning for refixing or removal to store complete all as specified and as directed for 20 mm dia bore | 80 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_860173.xls
BOQ • 0.98 MB
8526Tenderdoc.pdf
Tender Documents • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .