Superintending Engineer, ECTC, UPPTCL, Moradabad.
Superintending Engineer, ECTC, UPPTCL, PO Majhola, Moradabad.
Civil work for Increasing Capacity (2X63 1X20) MVA to (2X63 1X40) MVA at 132 KV S/s Kanth Road Distt. Moradabad.
2026_UPCTL_1174214_1
18(01)-ECTC/MBD/2026-27
Open Tender
Civil Works
Percentage
45 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE, ECTD, Moradabad
₹7,600
1 Aug 2026
1 Aug 2026
3 Sept 2026
1 Aug 2026
2 Sept 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kind of soil (2.8.1) | 5 | Cum | 194.9 | ₹974.5 |
| 2 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (4.1.10) | 20 | Cum | 4,880.73 | ₹97,614.6 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (4.1.2) | 1.5 | Cum | 6,245.11 | ₹9,367.66 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (5.1.2) | 2.5 | Cum | 6,772.9 | ₹16,932.25 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for.Foundations, footings, bases of columns, etc. for mass concrete.(5.9.1) | 25 | sqm | 293.62 | ₹7,340.5 |
| 6 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).(5.12) | 0.15 | Cum | 7,926.07 | ₹1,188.91 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.(5.22.6) | 700 | kg | 80.75 | ₹56,525 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) (6.1.1) | 1 | Cum | 5,518.69 | ₹5,518.69 |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(10.2) | 145 | kg | 100.11 | ₹14,515.95 |
| 10 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate(11.3.1) | 1.98 | sqm | 459.88 | ₹910.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.56 MB
BOQ_2205951.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].