Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹4.8 L
Closing Date
25 Apr 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
office of executive engineer rew anantnag
office of executive engineer rew anantnag
c/o pipe culvert eidgah saidnard rakhi brah
2022_RDPR_166416_5
ENIT03OF2022-23
Open Tender
Civil Works
Item Rate
30 days
anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
office of executive engineer rew anantnag
Exempted
26 Apr 2022
11 Apr 2022
26 Apr 2022
11 Apr 2022
25 Apr 2022
11 Apr 2022
120 days
Amount
Site Clearance by way of engagement of labours i.c cutting of shrubs, etc and temporary diversion of water.
Earth work in excavation by manual means in trenches, drains, pipes, cables etc (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 Sq.M in plan, depth up to 1.5 mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil. with all leads , lifts carriages complete.
Dry RR stone masonary well bounded in wire crates by using quarry stones excluding cost of wire crates after deduction of 15% voids
Cost of crates excluding cost of stones and carriage by MT
P/L dry stone soling in foundation including carriage by M/T avg lead 10 km
Provifding and laying of cement concrete of specified grade excluding the cost of centering and shuttering using mix M20 (1:1.5:3) with 40mm NSA
P/F form work of ordinary wood timber planks including removal of form work completely
Add cost of RCC spun pipes of 600mmdia including laying ,loading and unloading charges
Carriage of materials
Sand/Bajri @30Km
stone and soling H/L 350m from road site to working site
sand/bajri H/L 350 m from road site to working site
shuttering and RCC spun pipes H/L 350m from road site to working site
Provision for signboard, photographs and other unforeseen items(STA)
MUDASIR AHMAD CHARA
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .