Loading…
Loading…
Tender Value
₹16.9 L
EMD Value
₹43,000
Closing Date
22 Oct 2026, 3:00 pm
SA, ASI Trichy
o/o SA. ASI, TRICHY
TENDER FOR EXECUTION OF WORK MC and EW (DRB) MAINTENANCE OF CAMP OFFICE BUILDING and STAFF QUARTERS AT GANGAIKONDACHOLAPURAM UNDER THE HEAD MC and EW(DRB)-17.01.27 FOR THE YEAR 2026-27
2026_ASI_928598_1
T-15/180/2026-Trichy Circle
Open Tender
Civil Works
Works
STAFF QUARTERS AT GANGAIKONDACHOLAPURAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,000
Yes
1 Oct 2026
1 Oct 2026
23 Oct 2026
1 Oct 2026
22 Oct 2026
1 Oct 2026
1 Oct 2026 - 22 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1.01 | Removing the existing wooden mesh grills with door infront of the camp office including cost of all labour, material and other charges and stacking 50m away etc., complete ( DSR 15.13.2) | 20.98 | M2 | 165.94 | ₹3,481.42 | 18% |
| 1.02 | Providing MS grills with openings infront of the camp office building using with 50x50x6mm ms angle for outer the outer, 50x6mm MS flats for supporting the MS angles and fixing with 12mm dia square rods center to center 10cm each gape with necessary ASI logo for safety and security of the camp office building including cost of fabrication, welding charges, labours and materials and other cost charges etc., complete | 20.98 | M2 | 3,878.68 | ₹81,374.71 | 18% |
| 1.03 | Carefully dismantling the existing walls for enlarging the toilet block area for easy access to the officials at camp office and quarters and other areas including cost of all labour charges, disposal of debris to a far off place and other conveying charges etc | 8.3 | M3 | 1,809.88 | ₹15,022 | 18% |
| 1.04 | Dismantling the existing old cement plastered flooring, cleaning the surface and dumping the debris 50m away. | 83.1 | M2 | 48 | ₹3,988.8 | 18% |
| 1.05 | Earthwork excavation for laying foundation for office rooms, toilet blocks and temporary shed necessary disposal the debris to a far off place etc., including cost of all labours, materials and other charges etc., complete. | 1.6 | M3 | 228.67 | ₹365.87 | 18% |
| 1.06 | Laying foundation concrete 1:3:6 using 20mm stone Jelly including cost of all materials, labours and other charges etc., complete | 1.6 | M3 | 6,306.33 | ₹10,090.13 | 18% |
| 1.07 | Construction of RR masonry wall for foundation for construction of temporary shed for the camp office purpose using with cement mortar 1:4 including cost of all labour material and other charges etc., complete | 5.02 | M3 | 6,422.95 | ₹32,243.21 | 18% |
| 1.08 | Construction of brick masonry wall using with cement mortar 1:6 using bricks size of 23x11x7cm including plastering and cost of all labours, materials and other charges etc. | 21.48 | M3 | 6,265.7 | ₹1,34,587.24 | 18% |
| 1.09 | Plastering with cement mortar 1:4, 12 mm thickness afterconstruction of brick masonry walls including cost of all materials, scaffolding charges and other charges etc, | 191.53 | M2 | 304.88 | ₹58,393.67 | 18% |
| 1.1 | Providing and laying glazed finished vitrified floor tiles of size 600x600mm (thickness to be specified by the manufacturer), with water absorbtion less than 0.08 %, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement: 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/ sq.m including pointing the joints with white cement and matching pigments etc., complete.. | 75.27 | M2 | 1,277.03 | ₹96,122.05 | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
RFP.pdf
Tender Documents • 12.93 MB
BOQ_975852.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .