Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC LOWEST QUOTED AMOUNT |
| 2 | L2₹1.1 Cr+₹2.3 L (2.06%)Rejected-Finance GURHI MINUS NEAR BUS STAND POST PALACHOURAI TAHSIL JUNNARDEO DISTT CHHINDWARA 480449 MP | CHHINDWARA | MADHYA PRADESH | 480449 | ₹1.1 Cr+₹2.3 L (2.06%) | L2 | Rejected-Finance HIGHER QUOTED AMOUNT |
| 3 | L3₹1.1 Cr+₹3.4 L (3.05%)Rejected-Finance | ₹1.1 Cr+₹3.4 L (3.05%) | L3 | Rejected-Finance HIGHER QUOTED AMOUNT |
| 4 | L4₹1.3 Cr+₹21.8 L (19.7%)Rejected-Finance | ₹1.3 Cr+₹21.8 L (19.7%) | L4 | Rejected-Finance HIGHER QUOTED AMOUNT |
| Sl No | Description | Qty | Unit | NAGENDRA SINGH KUSHWAHA L1 | EASTERN MINING AND CONSTRUCTION COMPANY L3 | B AND B GROUP L2 | M/s Anjali Construction L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Hard rock in roof | 36.33 | cum | 4,900 ₹1,78,017 Lowest | 6,500 ₹2,36,145 | 7,170 ₹2,60,486.1 | 8,406.69 ₹3,05,415.05 |
| 2.00 | Excavation in Soft rock in floor | 71.73 | cum | 4,500 ₹3,22,785 | 5,000 ₹3,58,650 | 4,110 ₹2,94,810.3 Lowest | 4,818.82 ₹3,45,653.96 |
| 3.00 | Excavation in coal (side cutting) | 180.7 | cum | 4,500 ₹8,13,150 | 4,500 ₹8,13,150 | 1,600 ₹2,89,120 Lowest | 1,872.18 ₹3,38,302.93 |
| 4.00 | Brickwork in Superstructure (CM1:6) | 393 | cum | 10,000 ₹39,29,990 Lowest | 10,500 ₹41,26,489.5 | 12,350 ₹48,53,537.65 | 14,487 ₹56,93,376.51 |
| 5.00 | Brickwork in Foundation (CM1:6) | 361.2 | cum | 10,000 ₹36,12,000 | 9,900 ₹35,75,880 | 8,700 ₹31,42,440 Lowest | 10,196.1 ₹36,82,831.32 |
| 6.00 | Cement plaster 12 mm thick both side (1:6) | 1,442.02 | sqm | 340 ₹4,90,287.82 Lowest | 350 ₹5,04,708.05 | 490 ₹7,06,591.27 | 578.17 ₹8,33,734.44 |
| 7.00 | Construction of writing board by punning (1.00mx1.00m) 34 Nos. | 34 | sqm | 250 ₹8,500 | 750 ₹25,500 | 30 ₹1,020 Lowest | 32.4 ₹1,101.6 |
| 8.00 | White washing of constructed stoppings | 462.7 | sqm | 20 ₹9,254.1 | 20 ₹9,254.1 | 19 ₹8,791.4 Lowest | 21.28 ₹9,846.36 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 16,85,517.11 ₹16,85,517.11 Lowest | 17,36,959.8 ₹17,36,959.8 | 17,20,223.41 ₹17,20,223.41 | 20,17,847.19 ₹20,17,847.19 |
Tender Value
₹1.3 Cr
EMD Value
₹1.6 L
Closing Date
1 Jun 2026, 6:00 pmClosed
STAFF OFFICER MINING PATHAKHERA AREA WCL
OFFICE OF THE STAFF OFFICER MINING GM OFFICE PATHAKHERA AREA WCL
Construction of 34 Nos. Isolation Stopping in MD-1 Dist. LWS at Chhatarpur Mine No. 1, Pathakhera Area, WCL
2026_WCL_359685_1
PK3550-E-MIN-0002-2026-27
Open Tender
Miscellaneous Works
Item Rate
547 days
Chhatarpur mine no. 1, Pathakhera Area
Please Refer Tender Documents
5 documents required · 5 mandatory
₹1.6 L
Yes
15 Jul 2026
15 May 2026
3 Jun 2026
15 May 2026
1 Jun 2026
16 May 2026
15 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in Hard rock in roof | 36.33 | cum | - | - |
| - | Excavation in Soft rock in floor | 71.73 | cum | - | - |
| - | Excavation in coal (side cutting) | 180.7 | cum | - | - |
| - | Brickwork in Superstructure (CM1:6) | 393 | cum | - | - |
| - | Brickwork in Foundation (CM1:6) | 361.2 | cum | - | - |
| - | Cement plaster 12 mm thick both side (1:6) | 1,442.02 | sqm | - | - |
| - | Construction of writing board by punning (1.00mx1.00m) 34 Nos. | 34 | sqm | - | - |
| - | White washing of constructed stoppings | 462.71 | sqm | - | - |
| - | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_372547.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .