| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹2.4 LAccepted-AOC | ₹2.4 L | 1st | Accepted-AOC win due to 1st lowest |
| 2 | 2nd₹2.4 LRejected-AOC | ₹2.4 L | 2nd | Rejected-AOC reject due to 2nd lowest |
| 3 | 3rd₹2.1 LRejected-AOC | ₹2.1 L | 3rd | Rejected-AOC reject due to 3rd lowest |
| 4 | 3rd₹2.4 LRejected-AOC | ₹2.4 L | 3rd | Rejected-AOC reject due to 3rd lowest |
Tender Value
₹3.0 L
EMD Value
₹3,100
Closing Date
6 Feb 2026, 4:00 pmClosed
SE R and B Division No I Berhampur
SE R and B Division No I Berhampur
S/R to 2 nos of D type staff qtr building for Executive Engineers, Southern (RB) office at BAM such as constrn of Main gate and canopy
2026_EICCL_125217_1
SE R and B Divn NoI Bam 57/2025-26
Open Tender
Civil Works - Buildings
30 days
Ganjam
2 documents required · 2 mandatory
₹2,000
₹3,100
Yes
18 Mar 2026
30 Jan 2026
7 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
30 Jan 2026 - 6 Feb 2026
DISMANTLING brick or stone masnory in lime or stone mortar under 3m height and removing the debris within 50m lead including stacking the useful materials for reuse with cost of all labour and T&P required for the work etc. complete(excluding GST)
Earthwork in excavation in foundation in hard soil or gravelly soil including hard moorum, stony earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at places away from worksite with all leads and lifts including cost of all labour and T&P cess and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge.(excluding GST)
Filling in foundation and plinth with excavated earth well watered and rammed in 23.5 (9'') thick layers with all leads and lifts with cost conveyance, cess and royalities of materials and labour with T&P with cost, conveyance for the work etc. complete as directed by the engineer in charge (measurement will be taken on finished compacted section only) (Excluding GST).
Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3.2) size clean hard black broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6) thick to the required level ramming watering and curing etc. complete including cost conveyance and royalties of all materials and labour with T&P required for the work etc. complete including dewatering if required.(excluding GST)
R.C.C. work (1:1.5:3) M-20 having minimum compressive strength in work test of 200kg/square meter in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and 516 using 12mm to 20mm size (20mm not to exceed 25%) hard black broken granite stone chips of approved quality and from approved quarry including hoisting lowering laying and compacting concrete, watering and curing for 4 weeks centring, shuttering and finishing the exposed surfaces smooth providing grooves to beads where necessary, providing drip cess and proper randy the joint with wall surface where necessary and providing fan hooks as per requirement and ceiling smooth to receive white washing or painting including cost, conveyance, royalties, of all materials and labour with T&P required for the work etc .complete in all respect but excluding cost of binding wire of 18 to 20 gauge and labour charges for straightening cutting bending binding and laying the grills and placing in proper position etc. complete as per specification and direction of the Engineer-in-charge. (excluding GST) COLUMN BASE
COLUMN
PLINTH BEND
Straightening bent up or coiled HYSD rods, cutting bending cranking hooking welding or jointing (if required) the M.S. Rods or Tor steel and binding wires and binding tying the grills, hoisting, lowering and placing in proper position as required for RCC works with cost conveyance of m. s. rods or tor steel and binding wires of 18 to 20 gauge and labour with T&P required for the work etc. complete in all floors (weight of binding wires will not be made on weight of m. s. rods or tor steel only).(excluding GST)
Supplying providing fixing of MS grill with cost and conveance royality and taxes of all materials and labour with T&P required for the work etc complete in all respect as per drawing and techincal specification and as directed by the engineer in charge. Excluding GST)
Supplying providing fixing of MS ANGULAR with cost and conveance royality and taxes of all materials and labour with T&P required for the work etc complete in all respect as per drawing and techincal specification and as directed by the engineer in charge. Excluding GST)
Providing fitting and fixing plain formed METASHIELD (CRILL STEEL SHEET) standard back cost coloured 0.5 nominal TCT 600mm in standard length at 300mm with supporting steps jointing materials etc. including cost of all materials, machineries, T&P etc. Metashield EPG-10 Grace special polyester colour coating of 20 micron DFT on exposed surface and 5 micron DFT on unexposed surface over 5 micron DFT of special primer on both surface on OCRCA steel of minimum yield strength 240 mpa with hot dip zinc coating moss of 120gm confirming to IS 277 etc. including cost conveyance of materials and labour with T&P required etc. complete.(excluding GST)
FLY ASH BRICK (23cm x 11cm x 8cm) masonry in cement mortar (1:6) after immersing bricks for six hours in water before use in Superstructure using clamp burnt bricks of 9 size having a crushing strength of not less than 50 kg per sqm including splays cutting, circular moulding chamfering and corbelling, watering and curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors.(excluding GST)
12 mm (1/2) thick cement plaster (1:6) finished smooth to outside/inside brick walls after racking out the joints including watering and curing for 7 days with cost conveyance cess and royalties of materials and labour with T&P required for the work etc. complete. (excluding GST)
CEMENT CONCRETE (1:2:4) in F&F using 12mm (1/2) size crusher broken hard black granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete, watering and curing for four weeks with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors.(excluding GST)
Painting two coats with any approved paint over a coat of priming to WOOD work and IRON work including cost of the primer and sand papering polishing the surface with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors.(excluding GST)
Wall painting two coat with WEATHER COAT of approved shade and approved make over a coat of primer to give an even shade after scrapping old paint with scrapper, washing with soda water, priming with approved new primer including cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete in all respect in all floors. (excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_578305.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.26 MB
Tendernotice_3.pdf
PDF • 0.56 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_578305.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid