Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹21.5 L+₹3.4 L (18.9%)Rejected-Finance | L2 | Rejected-Finance Rate High |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
21 Dec 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE SEDC Salem
SE SEDC Udayapatty Salem-14
Works contract in respect of Petanaikenpalayam Sub division in Valapady division
2023_EB_398457_1
SE/SEDC/WC.NO.038/2023-24, Dt.09.12.2023
Open Tender
Electrical and Maintenance Works
Works
365 days
Valapady
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
28 Mar 2024
12 Dec 2023
22 Dec 2023
12 Dec 2023
21 Dec 2023
12 Dec 2023
Amount
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole
Stay bit 4.5” to 5” depth
Excavation of pole pit up to 9.14 mtr pole
Hard Rock requires without blasting
Erection of poles.
RCC poles/Metal pole up to 8.00m (27’)
RCC poles/Metal pole up to 9.14.m(30’) (300 kg)
Erection of stay set complete
Fixing of line materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22 KV)
Fixing of HT 11KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of Knob
Paving and Stringing of conductor
ACSR 7/4.09mm Raccoon conductor
7/3.35mm ACSR 7/3.15mm AAAC (Per wire per span)
7/2.59mm ACSR & 7/2.50mm AAAC (Per wire per span)
Structure Erection
Erection of Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos, Earth pits with tubes including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle including concreting (Except erection of transformer)
Erection of single pole structure
Erection of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting.
Transporting of Poles
Transport of Poles/Materials/Conductors and other materials (excluding loading and unloading charges) below 8 kms (Plains)
Above 8 Kms. For additional Km.
Loading & Unloading of Poles.
Loading of poles upto 27"
Loading of poles upto 30"
Loading of poles upto 30" and above including RSJ pole
Unloading of poles upto 30" and above including RSJ pole
Loading of Line Materials
Unloading of Line Materials
Sleeve concreting including Materials (Cement + River sand / M Sand and blue metals and watering)
Transporting of Poles
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual upto 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Erection of transformer
Loading of transformer upto 100 KVA
Unloading of transformer upto 100 KVA
Loading of transformer above 100 and upto 200 KVA
Unloading of transformer above 100 and upto 200 KVA
Erection of new transformers all capacitites (with Jumpering)
Services Connections.
Releasing of Single phase service wire and refixing.
Releasing of Three phase service wire and refixing.
Erection of street light including fixure fitting
Erection of street light service
Alteration of back / stay clamp
Drilling of hole in channel only 3/4" & 1" per hole
Releasing of ACSR / AAAC conductor from conductor Drum & Coiling for all sizes of conductor
Dismantling of Line Materials
Dismantling of pole & pole pit and loading unloading of grills 9 mtr
Dismantling of pole & pole pit and loading unloading of grills 7.5 mtr & 8 mtr
Dismantling of HT V Cross arms / Channel cross arms / Guarding cross arm 3 1/2, 4 1/2
Dismantling of HT Pin Insulators (11/22 KV)
Dismantling of HT 11 KV Strain Disc
Dismantling of HT/LT TI Fitting
Dismantling of 3 Phase X arm
Dismantling of 1 Phase X arm
Dismantling of Alu Knob
Dismantling of LT Pin Insulator
Dismanlting of LT Shackle Insulator
Dismantling of Stay set complete
Dismantling of Double pole structure poles of top channel seating CH & AB switch, open type set
Dismantling of transformer 63 to 200 KVA
7/3.35mm ACSR 7/3.15mm AAAC (Per wire per span)
7/2.59mm ACSR & 7/2.50mm AAAC (Per wire per span)
Dismantling of Re-Sagging of ACSR 7/3.35mm & 7/3.15mm Rabbit conductor
Dismantling of Re-Sagging of ACSR & 7/2.59mm AAAC 2.50mm Weasel and ACSR 7/2.11mm conductor
Releasing of grills from RCC poles
Cleaning of Branch tree cutting
Cutting of cocunut leaves per tree
G.S.T. @18% should be Entered by the Bidder
Usha Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .