Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹36.8 LSame as L1Rejected-Finance BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-Finance L2 | |
| 3 | L2₹36.8 LSame as L1Rejected-Finance BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-Finance L2 | |
| 4 | L2₹36.8 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 5 | L2₹36.8 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹43.6 L
EMD Value
₹4.2 L
Closing Date
20 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Banda Circle PWD Banda
SE Banda Circle PWD Banda
Special Repair Work on Jamuni purwa Link Road from Km 0 to 2 (Chainage 1.700 to 2.000)
2026_CEBAN_1206742_6
4505/35C-Banda Circle/2026-27 Dt 31-10-2026
Open Tender
Civil Works
Percentage
60 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹4.2 L
SE Banda Circle PWD Banda
25 Nov 2026
13 Nov 2026
20 Nov 2026
13 Nov 2026
20 Nov 2026
13 Nov 2026
18 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 72 | cum | 2,110 | ₹1,51,920 |
| - | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405. | 117 | cum | 2,755 | ₹3,22,335 |
| - | Construciton of un-reinforced, plain joint at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.3 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixerof not less than 0.20cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing. spreading the concrete with shovels, rakes, compacting using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying joint filler board near approcehes to bridges/culvert and construction joints, admixture | 270 | cum | 7,300 | ₹19,71,000 |
| - | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 | 330 | cum | 100 | ₹33,000 |
| - | Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) | 299 | cum | 120 | ₹35,880 |
| - | Sand filling in plinth including supply of necessary quantity of sand from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 38 | cum | 1,000 | ₹38,000 |
| - | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 35 | cum | 4,300 | ₹1,50,500 |
| - | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. | 48 | cum | 5,300 | ₹2,54,400 |
| - | 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584 | 165 | Sqm | 130 | ₹21,450 |
| - | Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 10.21 | cum | 5,600 | ₹57,176 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 3.85 MB
BOQ_2288066.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .