| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-Finance | L1 | Accepted-Finance Among the two bidders, this bidder has quoted the Lowest Value. | |
| 2 | L2₹15.2 L+₹2.5 L (20.0%)Accepted-Finance | L2 | Accepted-Finance Among the two bidders, this bidder has quoted the Highest Value. | |
| 3 | Rejected-Technical | - | Rejected-Technical as per TSC rejected on 07.09.2026 |
Tender Value
₹14.9 L
EMD Value
₹14,868
Closing Date
27 Aug 2026, 12:00 pmClosed
Executive Engineer,
O/o Executive Engineer, WRD, Araniyar Basin Division, Chennai
Rehabilitation of Inlet in the supply channel of medur tank in medur village of ponneri taluk in Thiruvallur District
2026_WRD_694537_1
e-Tender Notice No.01 DB/ JDO / F - 208 / 2026-27 / Dt.12.08.2026
Open Tender
Civil Works
Lump-sum
180 days
Thiruvallur
Satisfactorily completed for the Annual Maintenance Works past three year
5 documents required · 5 mandatory
₹0
₹14,868
10 Sept 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing scrub jungle etc, complete complying with standard specifications and as directed by the departmental officers | 1,191 | Square Metre | 6.36 | ₹7,574.76 |
| 2 | Dismantling,clearing away and carefully stacking material useful for resuse for Brick work ect.,Complete Complying with standard spesification and as directed by the departmental officers. | 80 | Square Metre | 302.96 | ₹24,236.8 |
| 3 | Dismantling,clearing away and carefully stacking material useful for resuse for Plain cement concrete ect.,Complete Complying with standard spesification and as directed by the departmental officers. | 3.5 | Cubic Metre | 520.23 | ₹1,820.81 |
| 4 | Earth work excavation for foundation in all soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated soil other than sand in layers of 15 cm thick well rammed and depositing the surplus excavated soil within the site in places shown by the departmental officers with initial lead and lifts cleaning and levelling the site etc., complete.SS20B | 21.25 | Cubic Metre | 123.41 | ₹2,622.46 |
| 5 | Providing and placing in position of Plain cement concrete M 10 grade using graded hard blue granite broken stone jelly of 20 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers specificatiions | 3 | Cubic Metre | 6,891.11 | ₹20,673.33 |
| 6 | Providing and placing in position of Reinforced cement concrete M 20 grade using graded hard blue granite broken stone jelly of 20 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officers specificatiions | 16.2 | Cubic Metre | 9,456.68 | ₹1,53,198.22 |
| 7 | Providing and placing in position of plain cement concrete M 15 grade using graded hard blue granite broken stone jelly of 20 mm size mixing with mixer machine including the cost of bailing/pumping wherever necessary laying the concrete in layers of not exceeding 15 cm thick, compacting, consolidation by using vibrators, finishing, watering, curing etc. complete complying with standard specifications and as directed by the departmental officersspecificatiions | 50.5 | Cubic Metre | 7,285.55 | ₹3,67,920.28 |
| 8 | Supplying, fabrication and placing in position of Ribbed Tor Steel for all RCC works as per design given including cost of steel,Binding wire and labour charges for cutting,bending,laying in position and tying with binding wire etc., complete as per standard specification and as directed by the departmental officers.
0 to 1.80 m Height | 59.5 | Square Metre | 637 | ₹37,901.5 |
| 9 | Supplying, fabrication and placing in position of Ribbed Tor Steel for all RCC works as per design given including cost of steel,Binding wire and labour charges for cutting,bending,laying in position and tying with binding wire etc., complete as per standard specification and as directed by the departmental officers.
0 to 2.70 m or 3.00 m Height | 154 | Cubic Metre | 717 | ₹1,10,418 |
| 10 | Supplying, fabrication and placing in position of Ribbed Tor Steel for all RCC works as per design given including cost of steel,Binding wire and labour charges for cutting,bending,laying in position and tying with binding wire etc., complete as per standard specification and as directed by the departmental officers. | 33.5 | Quintal | 9,189.5 | ₹3,07,848.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_835007.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_835007.xls
BOQ • 0.24 MB
PQ_Medur.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .