Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | +0.00% | ₹2.4 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹8,167.88 (3.47%)Admitted-Finance 36 1 1 H 2 PULAN KHATIK ROAD KOLKATA 15 KOLKATA KOLKATA 700015 | KOLKATA | WEST BENGAL | 700015 | +3.47% | ₹2.4 L+₹8,167.88 (3.47%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 L+₹13,110.98 (5.57%)Admitted-Finance | +5.57% | ₹2.5 L+₹13,110.98 (5.57%) | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
14 Sept 2026, 10:30 amClosed
EEC, BR-VII, KMC
9/1A, AJC BOSE ROAD, KOL-17
PAINTING OF KERB AND CHANNEL AT DIFFERENT ROADS IN WARD NO. 057
2026_KMC_1040737_1
KMC/EEC/VII/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
BOROUGH VII, KMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,800
17 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(6)(b) Washing & cleaning the wall surface & ceiling by soft detergent powder & soft water & render the surface free of dust, stain etc. | 1,995 | SQM | 8 | ₹15,960 |
| 2 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (i) One coat (white in shade) | 997.49 | SQM | 52 | ₹51,869.64 |
| 3 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(iii) One coat (with any shade except white) | 997.49 | SQM | 54 | ₹53,864.62 |
| 4 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) | 1,995 | SQM | 38 | ₹75,810 |
| 5 | Sub Total | - | - | - | - |
| 6 | GST 18% | 1 | Nos | - | - |
| 7 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
TF5723.pdf
Tender Documents • 0.58 MB
BOQ_2555925.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .