Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.4 LAccepted-AOC 232 RANA NAGAR BHAVANI ERODE DISTRICT 638 302 | 638302 | L1 | Accepted-AOC L1 | |
| 2 | L2₹48.8 L+₹3.2 L (7.06%)Rejected-Finance AVALPOONDURAI ERODE | AVALPOONDURAI | ERODE | TAMIL NADU | L2 | Rejected-Finance L2 |
Tender Value
₹46.1 L
EMD Value
₹47,000
Closing Date
30 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev.)
DRDA, Collectorate, Erode.
Improvements the 2 nos road in Package No. TN 12 - 01 of Erode Block under MGSMT 25 percentage 2022-23
2023_RDTN_328958_1
Roc No.2489/2023/A11 Dated 10.06.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Erode block, Erode District.
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹47,000
DRDA, Collectorate, Erode.
28 Jul 2023
17 Jun 2023
30 Jun 2023
17 Jun 2023
30 Jun 2023
23 Jun 2023
23 Jun 2023
Amount
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete.
PICKING THE Existing Worrot Bituminous road and tha rate including all material and labour etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for HM Stone
Provision for Name board , CIB ,Maintenance
60 cm Equilateral triangle(cautionary)sign board
60 cm circular(mandatory) sign board
Towards charges for maintenance
1st year Maintenance cost
2nd year Maintenance cost
3rd year Maintenance cost
4th year Maintenance cost
5th year Maintenance cost
PICKING THE Existing Worrot Bituminous road and tha rate including all material and labour etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS 20 A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compacti
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
Bituminous Concrete of 25 mm thick shall consist of Construction in a single couse of compacted crushed aggregates premixed with bituminous binder of 80/100 grade at the rate of 3.5 % by weight of total mix to serve as base / binder course in accordance with MORTH rev IV cl.504 specification and in confirmity with drawing.
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for HM Stone
Provision for Name board , CIB ,Maintenance
60 cm Equilateral triangle(cautionary)sign board
60 cm circular(mandatory) sign board
Towards charges for maintenance
1st year Maintenance cost
2nd year Maintenance cost
3rd year Maintenance cost
4th year Maintenance cost
5th year Maintenance cost
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Mahasamy Sakthivel
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .