Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILLAGE AND POST KHERA AFGAN TEHSIL NAKUR DISTT SAHARANPUR | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
25 Jan 2020, 12:30 pmClosed
Superintending Engineer
Electricity Distribution Circle II Saharanpur
Work of the Shifting to 33 KV Line and Doble Pole Div EDD II under Sub Div EDSD ITI SRE
2019_PVVNL_414476_3
68/W/EDC II/SRE/2019-20
Open Tender
Electrical Works
Lump-sum
60 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC II SRE
₹10,000
Yes
10 Feb 2020
18 Jan 2020
25 Jan 2020
18 Jan 2020
25 Jan 2020
18 Jan 2020
Amount
Detail of Work
Safety cartage of STP SP-55 11 Mtr ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.)
Safety cartage of other lines material (Except STP SP-55) from ESC, SRE/J.E. Store to the site of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.)
Erection of single support on STP Pole with complete fitting of all accessories of 33 KV line as per RESPO specification.
Safe cartage of STP SP-55 11 Mtr from site to ESC, SRE/JE store of work at various sites including loading & unloading at both ends (Distance 0 to 50 K.M.)
Fabrication and Erection of Double pole on ST Pole SP-55 11 Mtr. Long with complete fitting of all accessories of LT line as per RESPO Specification.
Fabrication and Erection of Four pole on ST Pole SP-55 11 Mtr. Long with complete fitting of all accessories of LT line as per RESPO Specification.
Grouting of 33 kV stay rods by digging of pits in block 600x600x300 MM & cement concreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/8 SWG and fitting the same on the pole including fixing of stay insulator in stay wire.
Providing of F clamps with nut bolts made of new MS flat strip 65x8 mm on PCC Pole.
Concreating of ST Poles SP-55 with cement concreting in block of 600x600x1500 mm in ratio 1:4:8 wtih cement sand and brick ballast size 1”x1.5” with plinth.
Providing of fixing of Earth Wire clamps with nut bolts made of new MS flat strip 65x8 mm on STP Pole.
Providing of PG clampsfor Dog to Dog conductor
Providing of fixing of Stay clamps with nut bolts made of new MS flat strip 65x8 mm on STP Pole.
Earthing of Pole by earthing rode.
Providing of 33 KV Holding clamps with nut bolts made of new MS flat strip 65x8 mm on PCC Pole.
Providing of fixing danger bord clamps with nut bolts.
Off shooting of tree branches touching the above 11 KV/LT Line.
Laying, lifting, stringing, sagging jumpring & binding of ACSR Dog conductor for 33 KV Line.
M/s Adesh Kumar Contractor
M/s Manoj Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .