| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-Finance | ₹3.8 Cr | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹3.9 Cr+₹7.6 L (2.01%)Rejected-Finance | ₹3.9 Cr+₹7.6 L (2.01%) | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹4.0 Cr+₹22.3 L (5.87%)Rejected-Finance | ₹4.0 Cr+₹22.3 L (5.87%) | L3 | Rejected-Finance 3rd Lowest Bidder |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.2 Cr
EMD Value
₹3.5 L
Closing Date
9 Nov 2020, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle , UPPTCL, 132 KV S/s Mohaddpur Old , UPPTCL, Gorakhpur
Supply of Material and work of Foundation , Erection and other associated work of Tower for Balance work of 132 KV Anand Nagar-Naugarh S.C. Line on D.C. Towers under ETD-II, Gorakhpur
2020_UPTCL_519343_1
E-Tender No. 65-ETC(G)/2020-21
Open Tender
Electrical Works
Item Rate
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
SE, ETC, Gorakhpur
₹3.5 L
29 Jan 2021
9 Oct 2020
10 Nov 2020
9 Oct 2020
9 Nov 2020
9 Oct 2020
Amount
WORK PART
Check Survey
Cost of Excavation of foundation pits including all earth works, backfilling and levelling etc.
Setting of stub including all foundation work (excluding the cost of concreting and excavation)
i. DA/DA+5
ii.DB/DB+5/10
iii.DC/DC+5/10/15
Cost of Concreting with 1:2:4 mix concrete for all type of foundation including cost of cement, sand, stone,ballast,dewatering, forming,shorting, shutering & curing excluding cost and installation of reinforcement of steel bars
Installation of steel reinforcement bars in R.C.C Foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc
Erection of super structure of all towers including of all work above ground level including fitting of danger, phase & number plate and fixing & punching of bolts excluding hoisting of insulator, hardware and accessories.
Tack Welding of all the bolts up to the height one section of the tower or 5 Mtrs from the ground level.
Laying, Stringing, tensioning, clamping, jointing etc. complete with ACSR panther conductor including hoisting of insulators, fitting of all necessary hardware and accessories.
Laying, Stringing, tensioning, clamping, jointing etc of 7/10 SWG earthwire including fitting of all necessary hardware and accessories.
Pipe type earthing including cost of coke, salt, excavation, backfilling and other associated work.
SUPPLY PART
Towers
DA+0 Normal (7 Nos.)
DB+0 Normal (7 Nos.)
DB+5 Extension (1 No.)
DC+0 Normal (18 Nos.)
DC+5 Extension (2 No.)
DC+10 Extension (2 No.)
Extra towers parts required to complete the shortage in recevied towers given by the Firm.
Stubs
DA+0/5 (1 Nos.)
DB+0/5 (1 Nos.)
DC+0/5 (1 Nos.)
DC+10/15 (1 Nos)
Nuts & Bolts
Towers Accessories
220KV Pipe Type Earthing Material for Towers
Porcelain Disc Insulators
Hardwares Suitable For Panther
Single Tension Fittings
Double Tension Fittings
Conductor Accessories For Panther (132 KV Line)
Vibration Dampers
Earthwire Accessories For 7/10 SWG Earth Wire (132 KV Line)
Suspension Clamp
Tension Clamp
Vibration Dampers
Copper Bond
M/S SHEKHAR ENGINEERING WORKS
shiv shankar enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .