| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹5.9 Cr+₹66.7 L (12.7%)Rejected-Finance | ₹5.9 Cr+₹66.7 L (12.7%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹6.4 Cr+₹1.2 Cr (22.5%)Rejected-Finance | ₹6.4 Cr+₹1.2 Cr (22.5%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹9.2 Cr+₹4.0 Cr (76.4%)Rejected-Finance | ₹9.2 Cr+₹4.0 Cr (76.4%) | L4 | Rejected-Finance Other than lowest bidder |
Tender Value
₹6.0 Cr
EMD Value
₹6.2 L
Closing Date
14 Jan 2023, 6:00 pmClosed
CHIEF ENGINEER COAST GUARD VISAKHAPATNAM
Office of HQ Chief Engineer (CG) Visakhapatnam-530007
PROVISION OF DREDGING / DEEPENING OF APPROACH CHANNEL AT NORTH MANDAPAM FOR CG JETTY AND POSITIONING OF CHANNEL BUOYS AT MANDAPAM
2022_MES_567736_1
CE CG VIZ MDP TOKEN 12 OF 2022 23
Open Tender
Civil Works
Item Rate
150 days
Manndapam
As per tender documents
8 documents required · 8 mandatory
₹3,000
GE(I)(CG) CHENNAI
₹6.2 L
Yes
27 Feb 2023
8 Dec 2022
16 Jan 2023
8 Dec 2022
14 Jan 2023
31 Dec 2022
Amount
ScheduleÁ'Part-1 (Site Clearance and Area development)
M&L for dredging the soil strata mixed with sand and coral reefs in sea at the navigation channel comprising maintenance dredging in 20 x 622 Mtr and capital dredging up to 20 Mtr on either side of existing 20 Mtr wide channel and beyond 622 Mtr channel up to 800 Mtr making a navigating channel of 60 Mtr wide and 800 Mtr length and providing slopes in 1:5 on either side along 800 Mtr length of channel . The design dredging level is 3.0 Mtr and conveying and disposing off dredged soil at the grid reference Latitude 9025’2.99” North and longitude 79011’11.07” East including Mobilization and De-Mobilization of all the equipment including dredgers, plants materials, labour etc/ brought to the site after completing the entire work complete all as specified and as directed.
Note :(Applicable for Item No. 1 above) i. Dredging Length – 800 RM ( 60 RM Wide) ii. The quantity comprises both maintenance and capital dredging. The maintenance dredging shall be carried out in an area of 20x 622 Mtr from the mouth of jetty basin. Approximate quantity of maintenance dredging is 19300.00 Cum. iii. The rate quoted shall be combined rate for capital as well as maintenance dredging .
Provision of buoys comprising of IM Glass Reinforced Plastic (GRP) buoys complete with Day mark and built in GRP fender and radar reflector of thickness 10mm and of diameter 1.5 m body filled with polyurethane foam, IM-3NM self contained LED beacon and powered with photovoltaic solar supply system and fixing to concrete block 1.00 Mtr x 1.00 Mtr x 1.00Mtr under water complete all as specified and as directed.
NORTHRNEXPRESS INFRADEVELOPERS PRIVATE LIMITED
ACE FOUNDATIONS AND STRUCTURES
WEST COAST DREDGING COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .