Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. | |
| 2 | Rejected-Technical AT HAZARIMORE P O HAZARI GOMIA DISTT BOKARO JHARKHAND 829128 | GOMIA | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical L3 Bidder | |
| 3 | Rejected-Technical AT PATWA TOLA HAZARI BASTI PO SAWANG DIST BOKARO JH 829128 | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical L2 Bidder |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
21 Oct 2024, 11:00 amClosed
Amit,Dy. Manager(CP), Sawang Washery, Kathara Area
Office of the Project Officer, Sawang Washery
Rubber lagging, Cold vulcanizing and patch repairing of different size conveyor of Main Plant and Deshaling Section under Sawang Washery for a period of one year.
2024_CCL_319118_1
SGW/KTA/ENM/E-Tender/24-25/53 Date 11.10.2024
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
8 documents required · 8 mandatory
₹7,000
19 Nov 2024
11 Oct 2024
22 Oct 2024
12 Oct 2024
21 Oct 2024
12 Oct 2024
12 Oct 2024 - 18 Oct 2024
Amount
Rubber lagging of 40BC, 51BC, Clean Coal, Middling Coal BC, C/M Shuttle BC, Stockpile BC, Stock pile Shuttle BC, BC-1, 2, 3, 4A, 4 and 5 head drum - i) 51 BC - 700mm x 1150mm = 2.53m2 ii) 40 BC- 600mm x 1150mm = 2.16m2 iii) C/Coal BC- 650mm x 1150mm = 2.35m2 iv) M/BC BC- 450mm x 900mm = 1.27m2 v) C/Shuttle - 400mm x 900mm = 1.13m2 vi) M/Shuttle- 400mm x 850mm = 1.06m2 vii) S Pile BC- 600mm x 900mm = 1.69m2 viii) S Pile Shuttle - 600mm x 850mm = 1.60m2 ix) BC- 1 - 900mm x 1150mm = 3.24m2 x) BC - 2- 900mm x 1150mm = 3.24m2 xi) BC - 3- 900mm x 1150mm = 3.24m2 xii) BC - 4A- 500mm x 1150mm = 1.80m2 xiiI) BC - 4 - 500mm x 1150mm = 1.80m2 xiv) BC - 5 - 500mm x 1150mm = 1.80m2 T = 28.91 m2
Cold vulcanizing of 40BC, 51BC, Clean Coal, Middling Coal BC, C/M Shuttle BC, Stockpile BC, Stock pile Shuttle BC, BC-1, 2, 3, 4A, 4 and 5 etc. - i) 51 BC - 1000m - 02 nos. ii) 40 BC - 1000mm - 02 nos. iii) C/Coal BC - 1000mm - 02 nos. iv) BC - 1 - 1000mm - 02 nos. v) BC - 2 - 1000mm - 02 nos. vi) BC - 3 - 1000mm - 02 nos. vii) BC - 4A - 1000mm - 01 no. viii) BC - 4 - 1000mm - 01 no. ix) BC - 5 - 1000mm - 01 no. T = 15 Nos.
x) Middling BC- 800mm - 02 nos. xi)S. Pile BC- 800mm - 02 nos. xii) S. Pile Shuttle BC- 800mm - 01 no. xiii) C/C Shuttle BC- 800mm - 02 nos. xiv) M/C Shuttle BC- 800mm - 02 nos. T = 09 Nos.
Patch repairing of different size conveyor in Main Plant and Deshaling Plant i) 40BC - 1.00 X 0.30 = 0.30m2 ii) 51BC - 1.90 X 0.45 = 0.85m2 iii) C/Coal BC - 1.00 X 0.35 = 0.35m2 iv) BC - 4A - 1.15 X 0.40 = 0.46m2 T = 1.96 m2
Total impact of GST for the purpose of CTC
RABINDRA KUMAR
M/S SHRI SHYAM ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_330775.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .